Walled In (Available in Geoenvironmental Special Issue only)
Of the many challenging aspects of the $10.8 billion, 7.5 mi long Central Artery Project in Boston, the construction of soldier pile, tremie concrete (SPTC) walls under the existing elevated...
Microtunneling under Honolulu
Highly congested urban utility corridors present some of the most difficult conditions for construction of new underground pipelines, especially when subsurface conditions are also very...
It's All in the Bracing
When the Massachusetts Bay Transportation Authority (MBTA) hired Weidlinger Associates Inc., Cambridge, Mass., to renovate the Aquarium Station stop along the subway system's...
High Rise Express (Available in Structural Engineering Special Issue only)
A new column system developed by the Canam Manac Group in Montreal offers the expediency of steel construction with the economy of concrete. The system is made entirely of lightweight...
Analysis, Design, Construction, and Testing of Deep Foundations
This proceedings,
Materials and Construction
Exploring the Connection
This proceedings,
Water, Water, Everywhere (Available in Geoenvironmental special issue only)
The discovery of extensive contamination just prior to construction of an underground library storage facility prompted engineers from the Minneapolis-based firms CNA Consulting Engineers...
Order Amid Uncertainty (Available in Geoenvironmental special issue only)
Bayesian statistical methods allow engineers to deduce probabilities from incomplete information. If there is a theoretical or empirical reason why a particular probability distribution...
Resolution Solutions
Disputes over such issues as change orders, extra work, delays, or defective work are an inescapable part of the construction process. By designing an effective dispute management program...
Program Management B.C.
Through a process of forensic analysis that applied modern-day technology to bridge the chasm of time, a team of construction managers with the international architecture/engineering/construction...
Sensitivity of Stormwater Conveyance System Cost to Design Recurrence Interval
(No paper) The cost of a piped and/or swaled stormwater system is determined principally by the storm recurrence interval (e.g., 5-year design storm) used to design it. That is, the present...
Practical Applications of Gage-Adjusted Radar?Rainfall Estimates
(no paper) It is radar's estimates of rainfall at a specific location that tends to disappoint. On the other hand, the strength of rain gage observations is in estimating rainfall at a...
Title Transfer of U.S. Bureau of Reclamation Projects: Fact or Fiction
(No paper) The U.S. Bureau of Reclamation (Reclamation) has constructed hundreds of water storage and delivery projects throughout the 17 western United States. These projects vary in...
Catch the Wind
Wind turbines can now produce energy that is cost-competitive with other, more conventional power generation methods. The increased efficiency is due in part to the turbines'...
Geo-Engineering for Underground Facilities
The papers collected in this proceedings
The Train to the Plane
Getting to New York's John F. Kennedy Airport is an urban nightmare. The Port Authority (PA) of New York and New Jersey, which operates the airport, has wrestled with proposals...
Stream Stability and Scour at Highway Bridges
Compendium of Stream Stability and Scour Papers Presented at Conferences Sponsored by the Water Resources Engineering (Hydraulics) Division of the American Society of Civil Engineers
Sponsored by the Water Resources Engineering (Hydraulics) Division of ASCE. This collection contains 75 papers and 321 abstracts presented at conferences...
Conquering the Cold
Three projects�a water treatment plant, an airport, and a hydroelectric plant�illustrate how practicing engineering in Alaska differs from working in the contiguous 48 states. Permafrost,...
Cold Regions Engineering
Putting Research into Practice
This proceedings,
Pipeline Safety, Reliability, and Rehabilitation
This proceedings,
Return to search