Design/Construct Contract Speeds Bridge Job
In the name of time and money savings, Pennsylvania DOT is building a bridge using a modified turnkey contract. In contrast, the standard approach is first to design the bridge, then ask...
Japan Spans the Inland
Japan recently opened the Kojima-Sakaide Route, a 13.1 km series of bridges across the Inland Sea. The route connects two of Japan's four main islands�Honshu and Shikoku....
Lessons from Schoharie Creek
The failure of the Schoharie Creek Bridge in New York State occurred in April 1987. Several investigative panels were commissioned. The failure has been generally attributed to scour,...
Cable Stayed Bridges
Two of these five papers on cable-stayed bridges deal with wind analysis. One develops the theory for motion due to flutter and reaches the conclusion that the vibrations are, in general,...
Soil Properties Evaluation from Centrifugal Models and Field Performance
The performance of geotechnical projects is dependent upon the appropriateness of the design theory to the boundary conditions, and the characterization of the soil properties used in...
Hydraulic Studies of Surface Drainage from Level Furrows
Field studies have been completed to quantify the surface drainage phenomenon from level furrows which were rapidly flooded and then drained from the inlet end of the furrow. The proportion...
Trickle Irrigation of Peppers in Eastern Canada
A field study was conducted in Southern Quebec to determine the response of bell pepper plants to four irrigation treatments combined with three nitrogen fertilizer rates. The amount of...
Verification of an Agricultural Land Drainage Model
An agricultural land drainage simulation model was tested under field conditions. The model was found to have several errors. Some of these errors were corrected and the model was tested...
Ultrasonic Flow Meter Testing
Six ultrasonic flow meters were tested in a hydraulics laboratory. Accuracies better than 2% were obtained with two transit-time meters on 14 inch diameter steel tubing. Poorer accuracies...
Flow Measurement Using a Digital Pressure-Time Method
This paper describes flow measurements performed by TVA's Engineering Laboratory as a part of absolute efficiency measurements of the two units at the Great Falls Hydro Plant....
Riverbank Instability Due to Bed Degradation
Degradation lowers the bed of an alluvial channel over a long reach. This has the effect of increasing the bank heights and angles, which decreases the stability of the banks with respect...
Toe Scour Protection in Open Channels
Scour at the toe of bank protection works is one of the major causes of failure of these structures. Weighted riprap toes are frequently used to prevent bank protection failure due to...
Initiation of Density Currents in Diverging Channels: Comparison of Field and Laboratory Data
The transition from free surface channel flow to a submerged density current has been investigated in the laboratory. A set of field data has been collected at a wastewater effluent site....
Sediment Discharge Measurement with a Point Sampler
A procedure for measuring total sediment discharge using point-source suspended-sediment data was developed. The proposed procedure, Total Sediment Discharge (TSD), was tested with field...
Stochastic Characteristics of Cobble-Gravel Bed Load Transport
Prototype tests of stochastic characteristic of cobble-gravel bed load transport have been done in Dujiangyan reach of Minjiang River in China in 1977-1985. All of 718 sample data from...
Analytical Studies of the Schoharie Bridge Failure
Analytical studies consisted of geomorphic, hydrologic, hydraulic, and erosion analyses including mathematical modeling with HEC-1 and WSPRO, the new FHWA water-surface profile model....
Schoharie Creek Bridge Model Study
On April 5, 1987, a major storm occurred in the Schoharie Creek watershed and the resulting flood caused the bridge to fail. The hydraulic model of the bridge was performed to simulate...
Physical River Model Results and Prototype Response
The Hydraulics Laboratory of the US Army Engineer Waterways Experiment Station (WES) has performed physical hydraulic model studies on various rivers for nearly 60 years. These studies...
Field Investigation in an Estuary: A Case Study of Cooper River/Charleston Harbor
In 1942, the flow of the Cooper/Ashley/Wando (South Carolina) River complex was altered by a flow diversion project. Subsequently, Charleston Harbor suffered a dramatic increase in maintenance...
Development and Application of the Chesapeake Bay Eutrophication Model
The paper discusses the formulation of a steady-state coupled hydrodynamic/water quality model of Chesapeake Bay. The intent of this model was to provide insight into the processes and...