Raising of King Talal Dam
The King Talal Project is located on the Zarqa River, a Jordan River tributary, in Jordan. An existing embankment dam, 100 m high, built in the mid-seventies by the Jordan Valley Authority...

The Development and Writing of the ASCE Manual of Practice for Steel Penstocks
The 'Manual of Practice for Steel Penstocks' is being written under the supervision of the Hydropower Committee of the ASCE Energy Division. The committee felt...

Prefabricated Power Plants, Experience and Prospects
This paper presents the prefabrication concept applied to the Greenup (Greenup Locks and Dam, Ohio River, 72 MW, 1982) and the Sydney A. Murray, Jr. (Old River Control Structures, Vidalia,...

Rocky Mountain Project?Overview
The Rocky Mountain Project, in Northwest Georgia, will be a three unit hydroelectric pumped-storage project with 850,000 kW installed in an above ground powerhouse. The gross water volumes...

Hydraulic Aspects of West Delaware Tunnel Hydroelectric Development
Construction of a 7,500 kilowatt hydroelectric plant at the end of a 70 kilometer long water supply tunnel posed unusual hydraulic conditions that needed special consideration. Cooperation...

Rehabilitation of the Historic Ocoee 1 Hydro Power Plant
The Ocoee 1 Hydro Plant is located on the Ocoee River 16 miles east of Cleveland, Tennessee. Built by the East Tennessee Power Company, it was placed in commercial operation in 1912. There...

Dillon Hydroelectric Project Performance Versus Expectations
The Dillon Hydroelectric Project was commissioned in 1987. Design and construction are briefly described; plant availability is compared with design expectations; and maintenance costs...

Development of Hanford Site Lysimeter Facilities
Lysimeters have been constructed at the Hanford Site near Richland, Washington to quantify mechanisms that affect migration of radioactive and hazardous waste in geologic media. The history...

Large, Monolithic, Weighing Lysimeters
Monolithic lysimeters preserve existing vegetation and soil properties that can be destroyed by excavation and filling. Site preparation for constructing large, monolithic lysimeters includes...

Lysimeter Use in Water Resources Research in China
The type, structure, development and application of lysimeter in China are reviewed in this paper. The construction and experimental observation of large non-weighing lysimeter in Ranzhuang...

Water Balance Lysimetry at a Nuclear Waste Site
Lysimeters measure effects of soil, vegetation, and climate on water balance and groundwater recharge at a nuclear-waste site in arid-southcentral Washington State, USA. Data from 4 lysimeter...

Small Lysimeters for Documenting Arid Site Water Balance
Small weighing lysimeters consisting of plastic pipes with lifting and drainage fittings were installed at the arid U.S. Department of Energy (DOE) Hanford Site in southcentral Washington...

Transpiration by Douglas Fir Using Lysimeters
During the spring of 1971 a 28 m Douglas fir tree was installed in a weighing lysimeter. Some details of construction are presented. The weighing mechanism consisted of eleven lengths...

Use of Lysimeters for Determining Characteristics of Pore Water
Lysimeters have been installed and used during the cleanup and stabilization of several former uranium processing sites in the western United States. In particular lysimeters have been...

Representativeness of Floating Evapotranspirometers
In the first part of the paper, the design, the working principle and the field installation of floating evapotranspirometer are described with the data logging system which delivers continuous...

Prefabricated Weighing Lysimeter for Remote Research Stations
After designing and constructing several precision scale system weighing lysimeters in Southern Europe and the Middle East, the need arose for a prefabricated 'turn-key'...

Estimating Upland Recharge in the Yucca Mountain Area
Field and modeling studies were conducted recently for the Fortymile Canyon watershed and the Rock Valley area near the site of the proposed high-level nuclear waste repository at Yucca...

Effect of Choptank Watershed Drainage Project on Suspended Sediment Concentration
Between 1974 and 1982, the Soil Conservation Service, U.S.D.A. conducted a sediment concentration study on the Choptank Watershed in Caroline County, Maryland to monitor the effects of...

Multiobjective Decision Theory ? Decision Support Systems with Embedded Simulation Models
The concepts of multiobjective decision making utilizing embedded computer simulation models and dimensionless scoring functions are described in the context of a decision support system...

Effects of Uranium Mining, Puerco River, New Mexico
Effluent from uranium-mine dewatering and acidic water released by a tailings-pond dike failure increased radionuclide activities in streamflow in the Puerco River in New Mexico and Arizona....

 

 

 

 

Return to search