Sludge Under Pressure
Few wastewater engineers ever have to deal with high-pressure pumping. In San Diego, however, city engineers will soon oversee a 100,000 ft long psi main that will transport sewage sludge...
Superfund: New Leadership, Old Problems
The often contentious Superfund program faces a Democratic administration�the first one since its inception�and reauthorization by a new congress, armed with a mandate to cut government...
Urban Water Planning?A Western Nevada Case Study
The result of the increased demands due to population growth in the Reno/Sparks urban area and new uses i.e., environmental and Pyramid Lake related, has created increased competition...
Innovative Wetlands in Urban Settings Using Dredged Material
As a result of its work in the waterways of the nation, the U. S. Army Corps of Engineers (USACE) has restored or constructed wetlands using dredged material in a number of urban/suburban...
Long-Term Performance of Wet Detention Ponds
Wet detention is a technology which has been successfully applied in recent years to improve stormwater runoff quality in urban areas. Since most systems have a short operational history,...
City of Federal Way Panther Lake Surface Water Study?A Case Study of HSPF Modelling in Urban Detention Basins
This paper presents a case study of using Hydrologic Simulation Program-Fortran (HSPF) as a tool for sizing large urban detention facilities. The Panther Lake drainage basin is a textbook...
Development of a Raw Water Master Plan Model to Assist Long Range Drought and Water Conservation Planning for the City of Louisville, Colorado
The City of Louisville, a municipal corporation charged with meeting the water demands of almost 5,000 water accounts and faced with a diminishing supply of available senior water rights...
Water Allocation: Matching Supply with Demand
The Colorado-Big Thompson (C-BT) Project was designed in the 1930's as a supplemental water supply for water users in northeastern Colorado. Since that time the water allocation has shifted...
Collection System Inspection and Rehabilitation Program
The Metropolitan Water Reclamation District of Greater Chicago is a regional wastewater and water resources agency responsible for serving an area of about 875 square miles. Recently the...
3 Counties Coordinated Water System Plans
The Coordinated Water System Plan (CWSP) process is a state mandated management tool created to get agencies and utilities to jointly address problems of current and domestic/municipal...
Developing, Managing, and Protecting Urban Aquifers in the Pacific Northwest
Water purveyors in the Puget Sound region have applied a variety of innovative techniques to effectively manage urban groundwater supplies from a quantity and quality perspective. Two...
Strategies for Developing Major Capital Facilities
Siting, permitting, and mitigating impacts present many challenges during the development of major capital facilities. As a result of the need for public involvement, environmental review,...
The West Point Story?Chapter 1: Overview and Planning
The West Point wastewater treatment plant is the Seattle metropolitan area's largest wastewater treatment plant, and it is being upgraded to provide secondary treatment. The planning,...
The West Point Story?Chapter 2: Project Management Approach
In 1985, serving as the program lead, Metro contracted with Lewis Zimmerman Associates to conduct a formal facility planning effort for the West Point wastewater treatment plant. It was...
The West Point Story?Chapter 3: An Integrated Park and Treatment Plant
The West Point Wastewater treatment plant in Seattle sits on a small parcel of land that juts out into Puget Sound. In 1984, controversy erupted when Seattle Metro recognized that West...
The West Point Story?Chapter 4: Design
Metro's approach to design was one of integrated environmental and plant design. The project team, with guidance from the community and the city's parks department, established goals before...
The West Point Story?Chapter 5: Construction
As design of the West Point plant neared completion, the municipality of Seattle addressed construction of the facilities. The challenge was to build a complex wastewater treatment plant...
A Comparison of Short Term Forecast Methods for Municipal Water Use
Water utilities routinely develop long range demand forecasts for use in the normal planning activities. In recent years, many utilities have sought to develop more short-term demand forecasts...
Low Flush Plumbing Fixtures and Wastewater Systems
The significance of low flush plumbing fixtures on the wastewater collection and treatment system serving a small community has been determined. Among the concerns studied were: functional...
Use of a Statistical Model to Forecast Future Wastewater Flows
Future wastewater flows are generally predicted based upon an assumed rate of population and industry growth within a treatment facility's area of influence. In a community with limited...
Return to search