Predicting Basin-Wide Tailwater Temperature Patterns by Combining Mechanistic and Statistical Water Quality Modeling
A simplified method for predicting water temperature patterns downstream of a peaking hydropower dam is described for the Fort Randall Dam tailwater of the mainstem Missouri River as part...
Dam-Break Study for Large Floodplain Area - A Case Study
In simulating a dam break flood in a large floodplain, the maximum flood level is sensitive to the off-channel storage volume used in the channel routing. An incorrect estimate of the...
Future Urbanization Effects on Occoquan Dam PMF
The Fairfax County Water Authority's Occoquan dam, in northern Virginia, are being anchored at a cost of about $2 million. The reason is to increase stability due to an increased PMF estimate...
Testing of Outlet Works Emergency (Guard) Gates Under Unbalanced Head Conditions ? Background and History
The U.S. Bureau of Reclamation has responsibility for ensuring the proper operation, maintenance, and safety of over 300 dams and reservoirs throughout the 17 Western States. Storage of...
Development of Test Procedures for Unbalanced Head Operation of Slide Gates
This paper will discuss the steps taken by the Bureau of Reclamation to develop a standardized procedure for testing unbalanced head operation of high-pressure slide gates for outlet works...
Testing Outlet Works Gates and Valves at USBR Dams Under Unbalanced-Head Conditions: Tieton Dam Unbalanced-Head Gate Test
The Tieton Dam outlet works installation geometry is the most common type used in U.S. Bureau of Reclamation (USBR) earthfill dams. An emergency guard gate is located in a gate chamber...
Testing Outlet Works Gates and Valves at USBR Dams Under Unbalanced Head Conditions: Close-coupled Guard and Regulating Gates at Yellowtail and Flaming Gorge Dam
Part of the U.S. Bureau of Reclamation (USBR) program for unbalanced testing of outlet works guard gates and valves at its dams involves testing facilities with 'close-coupled' guard and...
Simulation of Rapid Reservoir Drawdown for Flood Control, Cowlitz Falls Project
The Cowlitz Falls Dam is a run-of-river project, currently under construction on the Cowlitz River in Washington State, 23 Km downstream from the town of Randle. The requirements for reservoir...
Nonlinear Hydrodynamic Pressures on Dam Faces with Arbitrary Reservoir Shapes
A finite-difference method was used to calculate the nonlinear hydrodynamic pressures acting on the rigid dam faces during earthquakes. The geometry of the reservoir is in a realistic...
Performance of Prototype Aerating Weirs Downstream From TVA Hydropower Dams
TVA has constructed aerating weirs below certain of its hydropower dams to (1) increase tailwater dissolved oxygen (DO) content during generation, and (2) improve minimum flows between...
Reducing the Potential Downstream Impacts of a Dam Failure
The dam safety regulations imposed by the individual states in the United States vary widely and provide inconsistent protection for the citizens of different states. The proximity of...
Disaster Reduction in Dam and Reservoir Design
Disaster reduction for small- and medium-sized reservoir projects is considered for two specific types of dam failure: 1) during extremely high floods, and 2) when severe reservoir silting...
The Coyote Dam Outlet Works Replacement Project: Hazard Reduction
The Santa Clara Valley Water District's Coyote Dam faced three major concerns: siltation of the existing outlet; a fault that crosses the existing outlet pipe; and the dam toe and the...
Uncertainties of Tailwater in an Inundation Study: Dam Upgrade Optimization for Hazard Reduction
When an upgrade is required for a dam with an inadequate spillway system, the potential impact of tailwater during an extreme storm in an inundation study should be considered. This paper...
Analysis of Cabinet Gorge Dam
After a 1987 inspection of the Cabinet Gorge Dam, Part 12 consultants contracted by Washington Water Power (a private utility based in Spokane, Washington) made several recommendations...
Dam Safety Modifications for Clear Creek Dam Manuscript for ASCE Hydraulics Division 1993 National Conference on Hydraulic Engineering
Clear Creek Dam, an unsafe thin arch dam, was stabilized by constructing a concrete gravity buttress on the downstream face. During the Bureau of Reclamation's (Reclamation) Safety Evaluation...
New Austrian Dam Side-Channel Spillway
The Loma Prieta earthquake of 17 October 1989 damaged the chute spillway at the Austrian Dam near San Jose, California. The replacement spillway, with a higher design discharge of 11,500...
Bartlett Dam Fuseplug Auxiliary Spillway
Bartlett Dam is located approximately 77 km northeast of Phoenix, Arizona on the Verde River. The Bureau of Reclamation (Reclamation) has determined that the structure is not capable of...
The Dam Safety Process
A safe dam is one which performs its intended functions without imposing unacceptable risks to public safety, property, and welfare by its presence. Ensuring the safety of a dam requires...
Bureau of Reclamation Downstream Hazard Classification
An overview of the downstream hazard classification process used by the Bureau of Reclamation (Reclamation) and other U.S. Department of the Interior (DOI) agencies for the safety of dams...
Return to search