The Design of Macagua Concrete Face Rockfill Dam
This article describes the design characteristics of the concrete face rockfill dam at Macagua, which will have a total length of about 9,200 ft (2,800 m), an average height of 66 ft (20,0...

The Upstream Zone in Concrete-Face Rockfill Dams
The upstream zone of small rock, the supporting zone for the slab at many recent concrete-face rockfill dams has contained less than 20% of particles smaller than the No. 4 sieve. Such...

Drain Maintenance in the Imperial Valley
Imperial Valley, located in the southeast corner of California is one of the most intensely irrigated areas in the world. Since Colorado River salinity is currently about 800 mg/l (1....

Streamflow Losses in the Santa Cruz River, Arizona
The discharge and volume of flow in a peak decrease as the peak moves through an 89-mile (143 km) reach of the Santa Cruz River. An average of three peaks per year flow the length of the...

Developments in New and Existing Materials
Materials engineering has emerged as an identifiable professional practice within civil engineering in the past few years. Although materials engineering is not new, the concept that this...

Current Corps of Engineers Concepts for Roller Compacted Concrete in Dams
Since construction of Willow Creek Dam in 1982, Elk Creek Dam in southwest Oregon is the only Corps of Engineers dam to be constructed using RCC that has passed beyond the planning stage...

Application of Methods of Probabilistic Characterization of Soil Properties
The use of probabilistic methods to describe soil properties has many applications. One such application that has been developed is in the area of probabilistic slope stability analysis....

Coefficient of Variation of In Situ Tests in Sand
For a research project on the behavior of piles in sand for the United States Geological Survey and the Federal Highway Administration, ten sites were selected where detailed load tests...

River Lock Rehab: A Winter's Tale
Lock & Dam �1 on the Mississippi River between Minneapolis and St. Paul had deteriorated badly but the U.S. Corps of Engineers determined that replacement with a new structure...

New Plant Treats River and Well Water
A new 16 mgd water softening plant at Elgin, Ill. is designed to treat raw water either from the Fox River or deep wells, or in any combination. Flexibility of the chemical feed systems...

Bridge
Named Outstanding Civil Engineering Achievement of the Year, the Luling-Destrehan Bridge across the Mississippi River, twelve miles north of New Orleans, has a 1,222 ft. main span that...

Prefab Power
The Love Hydroelectric Generating Station, owned by the city of Vanceburg, Ohio, was prefabricated in France complete with all components, brought across the Atlantic and towed to Greenup...

Refuse Recycling
The refuse recycling plant at Columbus, Ohio, is a pioneer in burning as fuel a combination of refuse and coal. This hybrid fuel has advantages over burning either alone. One winter in...

Coal Terminal
The Charleston Shipyard River Coal Terminal was constructed by converting a port-side chemical plant at a third of the cost of equivalent major coal terminals. A staged program for the...

Flood Control
The Hamilton and Riemer reservoirs were constructed by excavating pits below grade to receive flood overflows from adjacent streams. The two reservoirs are part of a 52 sq. mile (135 km�)...

Design and Performance of Buried Fiberglass Pipes ? A New Perspective
The buried performance of fiberglass pipes was the subject of a comprehensive and multifaceted research program carried out in 1982 and 1983. Instrumentation, capable of accurately tracing...

River Meandering
The erosion and sedimentation processes associated with river meandering have a profound effect on man's use of rivers and their valleys, as well as the natural environment....

A Structural Engineering Perspective for Drilled Shafts
This commentary is an attempt to close the gap between the Building Code Requirements for Reinforced Concrete (ACE 318-83) and the design of drilled shafts. The context of design includes...

Instrumentation Performance in Soft Clay Soils (A Case History)
In 1978, IDEAL BASIC INDUSTRIES, INC. initiated construction of a cement manufacturing plant located south of Mobile, Alabama on the Theodore Ship Channel. Because deltaic clays were too...

Thalweg Disposal: Demonstration of an Alternative
Disposal of dredged material in the main channel, or thalweg, is an alternative disposal option for maintenance dredging. The material dredged from the Upper Mississippi River is clean...

 

 

 

 