Development of Small Hydro in Ontario
Ontario is Canada's most populous Province with approximately 10 million residents, representing 40 per cent of the country's population. The electricity needs...
Changing Legal Issues Regarding Transfer of a Plant Up for Relicensing
Part I of the Federal Power Act ('FPA') includes a little understood, but potentially powerful mechanism for encouraging the efficient development and prudent...
The Effects of Recent Legislation on Conventional, Non-Federal Hydropower
Over the past ten years, federal legislation has created competing economic incentives for the hydroelectric industry - loans and tax credit incentives to stimulate the growth of conventional,...
Streamlining Hydropower Regulation: Proposals for a New Licensing Process
Growing national concern over the environmental impacts associated with energy resources and the increasing dependence on foreign oil sources has resulted in a reawakening of interest...
Hydropower: Making Its Mark in North America
To discover what plans North American hydropower producers have for their hydroelectric resources in the 1990s, Hydro Review conducted a survey of leaders in the hydro generation industry...
Low Flow Impact on Power in the Great Lakes Basin
Approximately 94,400 mW of installed capacity in the Great Lakes Basin could be adversely affected by low levels/flows induced by drought or climatic warming. Methods for evaluating the...
Benefits and Applications of Modular Hydroelectric Pumped Storage
Hydroelectric pumped storage is the only proven and most efficient technology available for energy storage. It is used by utilities to provide peak and intermediate power and to optimize...
Feasibility of Adding Small Hydro to Federal Hydraulic Structures in the Upper Ohio River Basin
A national hydropower program exists in which non-Federal interests may develop power at Federal hydraulic structures which have that potential. This paper discusses associated considerations...
Yough Hydro Case History?Development 12 MW Facility
The Youghiogheny Hydroelectric Project (Yough Hydro Project) is licensed with the Federal Energy Regulatory Commission (FERC) as Project No. 3623. The project is a run-of-the-river facility...
The PEC Headworks Project?A Cooperative Hydropower Development
The PEC Headworks Project is a single-unit hydroelectric facility located at the headworks of the Potholes East Canal at O'Sullivan Dam on the Potholes reservoir near Moses...
Technology Transfer in the Bureau of Reclamation
In addition to its traditional methods of transferring technology through reports and manuals and participation in professional and technical societies, the Bureau of Reclamation has initiated...
Net and Hydroacoustic Monitoring of Fish Passage
In 1986 EPRI published a review of available fish protection technologies for use at hydroelectric facilities. One major conclusion of that study was that fish protection systems were...
Screening Data with an Expert System (PDAS)
The performance of a three-mile long penstock, constructed in an active landslide area in northern California, is monitored using 138 vibrating wire-strain gauges. Readings are taken daily,...
Load/Resource Matching for Period-of-Record Computer Simulation
The Southwestern Power Administration (Southwestern), an agency of the Department of Energy, is responsible for marketing the power and energy produced at Federal hydroelectric power projects...
The Wisconsin River System Operations Model: WIRSOM
The passage of the Electric Consumers Protection Act of 1986 requires the Federal Energy Regulatory Commission to give equal consideration to non-power as well as power values in hydroelectric...
Digital Governor Application ? Bradley Lake Project
The Bradley Lake Project has two impulse turbines rated at 60 MW each to provide power to the Railbelt region of Alaska. Solid state digital governors are utilized to respond to system...
Deflector Synchronizing and Governing
This paper is a survey of deflector control speed govern impulse turbines for synchronization to a grid, and for isolated operation. There are several advantages to deflector control versus...
Optimal Real-Time Control of Hydroelectric Power Plant Using Dynamic Programming
In this paper, an approach of optimal real-time control of hydroelectric power plant operations is presented. The methodology is based on a dynamic programming technique where the original...
Hand Held Powerhouse Control Console or Portable Data Terminal
The Portable Data Terminal (PDT) is a very small light weight hand held computer terminal that communicates with the control system computer by radio. An operator monitors power plant...
A New Power Invention
Hydropower is the most natural form of energy generated in the World. It allows us to make use of our natural resources without pollution. It harnesses the basic fundamentals of nature...