Reappraising the Space Shuttle Program
This paper argues that the experience of the Space Shuttle program has been misinterpreted. Conventional wisdom holds that the shuttle is an example of a weak national commitment. This...
A Pilot Sounding Rocket Project Utilizing Student Labor
Space science experiments have been accomplished by suborbital, sounding rockets for over forty years. This inexpensive, reliable, and unique launch platform provides the basis of a state-wide...
In Situ Recovery of Water from Dormant Comet Cores & CI Carbonaceous Chondrites
Water and volatiles may be produced by drill holes into dormant comet cores or class CI or CM asteroids. This is modeled after in-situ mining as in the Frasch process sulfur mines of the...
The Design and Use of Flow-Through Hold Pads
The Chicago Delay Task Force recommended the construction of nine largescale, flow-through hold pads at Chicago O'Hare International Airport to reduce the potential for airfield gridlock....
Fine Tuning the Airfield: The New Denver International Airport
This paper discusses airfield layout considerations that have been incorporated into the design of the new Denver International Airport (DIA). These concepts include some unique provisions...
Aircraft Noise Monitoring at Denver International Airport
This paper describes design of the noise monitoring system for Denver International Airport. When the airport opens in 1993, the system must monitor compliance with two standards established...
The Army Aviation Team from a Military Civil Engineer's Perspective
The Technical Session for which this paper is written is 'Airfield Pavements - A Team Effort.' As such, the emphasis on this paper is the United States Army Aviation Team, and not the...
City and County of Denver Approach to Management Requirements
Construction of large infrastructure projects has become increasingly rare since the 1960's. In fact, America has not built a new airport since 1974. While sparse funding is certainly...
Management of Design
Denver's new airport uses the services of over 80 separate design firms. The existing airport, Stapleton, could not be expanded to meet the forecasted demand of 1,200,000 operations with...
Construction Approach to Denver International Airport
The new Denver International Airport, a $2.7 billion project, is being designed and constructed under the oversight and guidance of a Program Management Team (PMT) led by the City and...
Denver International Airport Fabric Roof Design
The design of Denver's Landside Terminal Complex for the new Denver International Airport, called for some far reaching vision coupled with imaginative building technologies. Because of...
Soft Touch People Mover Central Control
The people mover central control systems perform many automatic functions, are built with off-the-shelf redundant hardware, include advanced color graphics and touch screen operator interfaces,...
The Design of the Airside Concourses
The growth of commercial air traffic in the United States has resulted in the development of the 'New Denver International Airport.' the airside concourses were designed by joint venture...
Airport Landside Management: An Unique Airport Specialty
Air transportation has become a common and preferred method of travel, resulting in an ever increasing number of air passengers. The significant growth has resulted in unique and never...
Baggage System Implementation at DIA
BAE Automated Systems is currently under contract to supply the complete, Integrated Automated Baggage Handling System (IABHS) for the New Denver International Airport. The system represents...
Impact of the New Denver Airport on the Air Traffic Control System
Building the new Denver Airport has two major impacts on air traffic control: first, it requires redesigning the airspace surrounding the Denver area; and second, it requires moving to...
The Airport Traffic Control Tower for the New Denver International Airport
Developing a new airport traffic control tower involves many complexities of planning, engineering, and coordination. For the ATCT at the New Denver International Airport, these complexities...
A Guideline for Determining Minimum Threshold Requiring Traffic Impact Studies
Over the years, a number of localities have developed and adopted some form of traffic impact assessment (TIA) guidelines. As part of this study, an informal survey conducted showed that...
Estimation of Pass-By Trips Using a License Plate Survey
The objective of the study was to determine whether it is possible to estimate the percentage of pass-by trips using a license plate survey instead of the traditional interview survey....
The Isolated Signalized Intersection as a Mitigation on a High-Speed Highway
A concentrated 'leap-frog' type development is commonly proposed as it offers the opportunity to organize an extensive living-recreation orientated site with low to modest land costs....
Return to search