Liability Insurance Coverages for Designers of Temporary Structures
A recent survey completed by the American Consulting Engineers Counsel (ACEC) indicates that in 1990 approximately 40 claims occurred per 100 firms. There also is an indication that claims...
Limit States Design of Wooden Formwork for Concrete Walls
Load and resistance factors are developed for ultimate limit states design of wooden formwork components for concrete walls when the lateral concrete pressures are computed using the ACI...
FHWA'S Bridge Temporary Works Research Program
The Federal Highway Administration (FHWA) has developed a research program to address bridge falsework design and construction. This resulted from the collapse of the Route 198 bridge...
Development of Standards for Slipform & Jumpform Works
Review of past work indicates substantial effort has been made to publish construction standards and guidelines for slipforms but published material pertaining to jumpforms is scarce....
Temporary Lateral Support System for Historic Building Facades in Boston
This paper describes a system of vertically cantilevered structural steel trusses, designed by the author, that provided temporary lateral support for a group of five and six story, 120...
Permanent Structure as Part of the Underpinning System for Boston's Central Artery
The Central Artery, a major six lane structural steel viaduct, has been one of Boston's most significant roadways over the past three decades. Increasing congestion, accidents,...
Design and Planning of Structural Steel Roll-In
Innovative construction methods were required to erect structural steel inside a 170 foot long box truss over a railroad. The contractor engineered and executed a unique system to roll...
Composite Twin Tub Bridge Erection Intersection of Interstate I-84 and I-94 in Hartford, Connecticut
Curved bridge erection requires detailed preparation by the contractor, plus a sharing of responsibility and liability between the owner, designer of the new structure and the contractor....
Who Pays for the Unexpected in Construction: Hi-Rise Engineers Point of View
The unexpected in high-rise construction can be traced to design criteria evolving from environmental models and probes, as well as 3 general problems dealing with quality control in contract...
A Design for Automated Pavement Crack Sealing
An automated crack sealing system can have substantial economic benefits including reduced labor costs, improved quality, and improved safety. While automating crack sealing is technically...
Productivity Applications: 3D Models & Simulation
Background. Although three-dimensional computer models have been used to some degree in practice by a few large engineering and construction firms, there has been little research into...
Computer Assisted Design and Construction
This paper presents a comprehensive package for conducting structural analysis, design, and project management on microcomputers. Several examples are presented to illustrate the usefulness...
A Framework for Reasoning About CAD Data
A system capable of reasoning about CAD data offers the opportunity to substantially improve a design or a construction plan by providing feedback about an engineer's artifact. This paper...
Integration of CAD and Knowledge-Based Systems?An AI Architecture
This research focuses on the use of CAD-KBSs integration as a tool for increasing constructability in design and accomplishing construction management functions. Beyond the drafting ability,...
Reasoning for Data Integration
Improving the inter-disciplinary communication of design and construction data is an important objective in improving the competitiveness of our construction industry. This paper discusses...
Design and Construction Integration Using Object Oriented Project Model with Multiple-Views
Generating, sharing and maintaining project data among multiple disciplines and throughout a project life cycle is difficult task in the highly fragmented A/E/C industry. Presently, the...
Integrating the Processes of Design, Scheduling, and Cost Estimating Within an Object-Oriented Environment
This paper describes the conceptual design of several processes for performing the stages of building design, construction scheduling, and cost estimating within an object-oriented environment....
Requirements of Object-Oriented Databases for Supporting Collaborative Engineering
Object-oriented programming is gradually evolving into a popular and standard paradigm for large software application development. Typical examples include computer-aided design and engineering...
Automating Project Scheduling?A Case Study
This paper describes the on-going development of a 'finite element' based, project planning and scheduling package which uses knowledge bases, inference engines,...
An Object Oriented Design Methodology for Systems Integration ? A Research-in-Progress Report
This paper reports the progress of a research project to develop an object oriented design methodology for systems integration. The paper discusses motivation for this research, research...
Return to search