Urban Public Transportation Systems
Implementing Efficient Urban Transit Systems and Enhancing Transit Usage
Papers presented at the ASCE's First International Conference on Urban Public Transportation Systems held in Miami, Florida, during March 21-25, 1999, are included in this...
The Digital Evolution
As designers such as Gehry Architects dream up ever-more fluid and sculptural shapes for buildings, the only way to turn those aesthetic shapes into solid, safe structures is by using...
Wireless Warnings
Formwork failures cause dozens of construction-related deaths per year, but most can be avoided by adequate monitoring. The problem is, most monitors must be hard-wired to a computer on...
Tight Squeeze
The Newark, New Jersey Route 21 Viaduct Replacement is a massive, $250 million highway improvement program being undertaken by the New Jersey Department of Transportation. Michael Baker...
Smart Sign Support
The Route 80-MAGIC (Metropolitan Area Guidance, Information and Control) project is considered to be the showcase Intelligent Transportation System (ITS) project for the state of New Jersey....
IZMIT (Kocaeli), Turkey, Earthquake of August 17, 1999, including Duzce Earthquake of November 12, 1999
Lifeline Performance
Prepared by the Earthquake Investigation Committee of the Technical Council of Lifeline Earthquake Engineering of ASCE. On August 17, 1999, the Izmit...
Toronto's Tunnel Solution (Available in the Geoenvironmental Special Section only)
The Toronto Transit Commission (TTC), one of the largest public transportation systems in North America, carries more than 1,000,000 commuters a day. The TTC's tunnels had...
Communicating in a Crisis
As professionals following the strictest ethical standards, civil engineers are entrusted with safety and well-being of the public, regardless of the scale or range of their designs. By...
Fast TRAX
The Utah Transit Authority (UTA) completed its 15 mi (24 km), 16-station light-rail transit system, called TRAX, 13 months ahead of schedule and more than $20 million under budget. The...
On the Question of Accepting Work Outside One's Field of Expertise: An Ethical Fail Safe
The winner of the Daniel W. Mead Prize for ethical writing by a student discusses the history of the development of ASCE's code of ethics. Although it may be legal for civil...
Transportation Planning and Air Quality IV
Persistent Problems and Promising Solutions
This proceedings,
Rebuilding a Railroad Bridge
The Peck Movable Bridge and Bridgeport Viaduct is a four-track crossing in Connecticut that serves three rail lines. The 1904 bridge had deteriorated, causing a kink that forced trains...
Monitoring Construction Vibrations (Available in Geoenvironmental Special Issue only)
A review of procedures, criteria and equipment used to protect buildings and other structures from construction generated vibrations, the article begins by describing the importance of...
Through Frozen Ground
The most difficult section of the Massachusetts Bay Transportation Authority's (MBTA) Silver Line transit corridor project is approximately 112 m (400 ft) of tunnel below...
Substructures Stack Up (Available in Structural Engineering Special Issue only)
As part of a 1997 research project sponsored by the Texas Department of Transportation and the Federal Highway Administration, the University of Texas at Austin Center for Transportation...
Early Warning System
The Rock Hazard Rating System (RHRS) can help highway owners mitigate the risks of rock slope failure. This system helps owners determine which slopes are most hazardous and should be...
Case Studies in Optimal Design and Maintenance Planning of Civil Infrastructure Systems
Sponsored by the Structural Engineering Institute of ASCE. This collection contains 19 papers on the optimal design and maintenance planning of civil...
Perpetual Pilots
Because testing new processes, treatment chemicals, and operational modifications is difficult in full-scale water treatment facilities, many utilities are installing permanent pilot plants....
Cost-Effective Risk-Based In Situ Bioremediation Design
(No paper) Risk-based corrective action (RBCA) is rapidly becoming the method of choice for remediating contaminated groundwater sites, particularly for contaminants such as petroleum...
Risk-Based Corrective Measures for Waste Management Facility Closure
(No paper) In the past several years, risked-based corrective measure has been gradually accepted by federal and state agencies as a standard practice for site remediation or site closure....
Return to search