Applicability of Scour Equations in Tidal Areas
Bridge scour and waterway instability in the coastal region where waterways are subjected to tidal flow can be subjected to mass density stratification, water salinity, sedimentation (littoral...

The South Bay Ocean Outfall
For more than 60 years, raw sewage has flowed down the hills of Tijuana, Mexico into the Tijuana River, crossing the U.S.-Mexican border. The sewage contaminates the low-lying river valley...

A Stormwater Management Plan
Part 2 of the National Pollutant Discharge Elimination System (NPDES) Stormwater Permit requires both sampling and analysis of stormwater and the control of illicit discharges to stormwater...

Rainfall-Runoff Modeling for Watershed Stormwater Management
In the design of watershed stormwater management plans used for land development, the Pennsylvania State Runoff Model (PSRM) presents upstream subbasin flows that contribute to the peak...

Simulation of Channel Changes Induced by a Reservoir
A fluvial study was made for potential stream channel changes induced by a reservoir. It is generally recognized that a reservoir induces sediment deposition along the upstream channel...

Forcing Function and Climate Change
A system framework for investigating the effect of climate change in the upper Rio-Grande river basin, New Mexico, is developed. The forcing function or input into a climate change model...

Santa Ana River Mainstem Project
The Santa Ana River Mainstem Project consists of seven major features including the construction of 550 ft. high earth and rockf ill dam; raising the embankment by 28 feet of Prado Dam,...

Benefits of the Santa Ana River Mainstem Project
1. Need for additional flood control in Orange County. A. Orange County flood history. B. Increasing Population and development. C. Santa J River flood threat today. 2. How the Santa Axia...

Problem and Technical Solutions: The Seven Oaks Dam, Physical Elements of the Seven Oaks Dam Feature
Seven Oaks Dam is located in the upper Santa Ana Canyon approximately 1 mile from the canyon mouth. The site is 8 miles northeast of the city of Redlands in San Bernardino County on the...

Aspects of River House Cleaning during Floods
In spite of all the destructive forces of floods, the washing and scouring of polluted bottom deposits during spring floods gives the rivers a new start at the beginning of what is usually...

The Treatment Train Detention Concept
With the recent concern for nonpoint source pollution impacts to receiving waters, the Village of Saukville, Wisconsin took advantage of state funding grants to conduct a Stormwater Management...

Ponding Study of January 1993 Storm Event within Airport Industrial Park, Oceanside, California
A water ponding study was conducted to investigate flooding that occurred during the January 16, 1993 storm event (the event) in the Oceanside Airport Industrial Park (the Park), located...

Calibration of Sediment Transport Model for the Upper End of Elephant Butte Reservoir
Elephant Butte Reservoir is located about 125 miles north of El Paso, Texas on the Rio Grande. The reservoir is approximately 35 miles long with a narrow neck, called the Narrows, about...

Combined Flood Hazard Mitigation Techniques for Comprehensive Planning? The Saugus River Coastal Flood Risk Reduction Plan
The development of an alternative Coastal Flood Risic Reduction Plan for the Saugus River was initiated by the Executive Office of Environinental Affairs (EOEA) of Massachusetts in April...

Computing Flood Damage Reduction Accomplishment
Following flood events, the damage reduced by a federal flood damage reduction project must be computed to inform the public and assist officials in making decisions. This paper will describe...

Sanata Ana River Project Environmental Compliance with the National Environmental Policy Act (NEPA)
The National Environmental Policy Act(NEPA) was first enacted in. 1969, and became effective as of January 1, 1970. The law was intended to ensure that balanced decision-making occurs...

Cooperative Approaches in Achieving Additional Water Conservation at Prado Dam
The Orange County Water District (OCWD) has successfully negotiated multi party agreements that provide for the use of Prado Basin for water conservation while ensuring protection of the...

Design Alternatives for Protection of the Santa Ana River Interceptor Sewer
The Santa Ana River Interceptor Sewer (SARIS) line buried within the floodplain of the Santa Aria River is being threatened by long term degradation of the river bed at the pipeline crossings,...

Risk-Based Planning and Management of Maintenance Dredging
The U.S. Army Corps of Engineers (Corps) Institute for Water Resources (IWR) is developing and applying a risk-based approach to address maintenance dredging cost, reliability, and budgetary...

Interdisciplinary Research of Mountainous Areas: Past, Present, and Future
In the past few years, there has been a growing recognition internationally, of a need to better understand hydrometeorologic, hydraulic, sedimentologic, geomorphic processes in gravel-,...

 

 

 

 

Return to search