Building a Pipeline?Not a Flow Through Process
This paper will illustrate that the planning, design, and construction of a 32-mile water supply pipeline from Stockton Lake to Springfield involves more than just digging a trench, placing...

Design Criteria and Specifications for Pipeline Rehabilitation Projects
Pipeline rehabilitation, while not a completely new technology, is nevertheless a fairly recent development, just now coming to the forefront as to common usage. It is not however a fail-safe...

Cost of Rehabilitation of Water Distribution Systems
The Chester Water Authority was established in 1868 and supplies water to residential and industrial customers in three counties in Southeastern Pennsylvania, and in addition, wholesales...

Water Main Rehabilitation Using Silicote Lining
In an attempt to find a cost effective rehabilitation alternative for over 320 miles of unlined distribution water main, the Louisville Water Company has evaluated a new rehabilitation...

Infrared Thermographic Sensing of Sewer Pipeline Problems
When a sewer caves in, it often takes the street, sidewalks, and surrounding buildings along for the ride. These collapses endanger public health and safety. Repairing a sewer before such...

Seattle Swings Again
The 1992 Outstanding Civil Engineering Achievement Award went to a bridge that the experts said couldn't be built�a concrete segmental box girder swing bridge with twin leaves...

Polyolefin Plastic Water Service Line Performance
Polyolefin (PO) plastic piping made from polyethylene (PE) and polybutylene (PB) materials have been used in diameters of about 1 in. for water service lines for buildings. Both PE and...

Turning on the Waterworks
A new tunnel, two pumping stations, reservoirs and 150 mi of pipe have 23 municipalities in DuPage County, Illinois awash in Lake Michigan water, ahead of schedule and under budget. Bringing...

Migration of Spilled Oil from Ruptured Underground Crude Oil Pipelines in the Memphis Area
This study evaluated the impact of an oil pipeline rupture in the recharge area of a West Tennessee aquifer. Two potential break locations were chosen in the alluvial valley of a main...

Earthquake Countermeasures for Lifelines in the Central and Eastern United States
Seismic hazards affecting petroleum transmission systems in the Central U.S. and water and gas distribution systems in the Eastern U.S. are discussed. Experience during previous earthquakes...

Dallas Goes Trenchless
Dallas Water Utilities (DWU) has stopped relying solely on traditional open-cut trenching methods. Instead, we look to trenchless technologies to minimize costs and disruption to the public....

Pipeline Storm Behavior on Clay Soils
A series of transverse wave loading tests was conducted on a specially mounted section of pipe in a sediment-filled tank, to investigate the stability of unburied submarine pipelines under...

Skin Friction Distrtibutions on Piles in Sand
Presented in this paper are early results from an analytical investigation of the performance of a closed-ended pipe pile under monotonic axial loading in dense sand. The study was performed...

Review of API Guidelines for Pipe Piles in Sand
Most offshore structures are supported using steel pipe piles which are designed in accord with API Recommended Practice 2A. The guidelines for analysis of axial capacity of steel pipe...

Homopolar Pulse Butt Welding of API 5L Line Pipe
Homopolar pulse welding (HPW) is a welding process that is being investigated as a means to rapidly join API line pipe, having particularly great potential for application in deepwater...

A Fourier Series Solution to Bottom Roughness Induced Stresses During Pipe Laying
Often during installation, a subsea pipeline must be laid along seabed portions with rough profiles. The pipeline is forced by the bottom irregularities to bridge across consecutive protuberances....

Manholes and Microtunneling
Contractors are for the Oakwood Beach Interceptor Sewer Project, on Staten Island, N.Y., were having difficulty. Glacial tills and a high water table made working 90 ft below the ground...

Pressure Pipeline Design for Water and Wastewater
This committee report, Pressure Pipeline Design for Water and Wastewater, is a revision of the 1975 ASCE publication Pipeline...

Cables and Anchorages
The following types of cables are generally used in cable stayed bridges: Parallel bars; Parallel seven wire strands; Parallel or semi-parallel wire cables; Locked coil strands and ropes;...

Decentralized Wastewater Management
With the discovery earlier this century that city squalor caused disease, we protected ourselves by piping raw wastes away. Later, when the discharge had transformed rivers into foul,...

 

 

 

 

Return to search