A 15 mile section through downtown Phoenix will complete Interstate 10. After years of delay, the project is now close to completion. The project required construction of 6.5 miles of...

Resource Allocation with Project Manager Control
There are some logical reasons behind the partial acceptance of the resource allocation research by the construction industry. These reasons are based on field experience and the daily...

Avoiding Disputes Through Better Management Techniques: A Contractor's Viewpoint
Utilizing management techniques to avoid disputes is an important function which allows resources to be focused on the project objectives. Relationships are enhanced, cost are reduced,...

Avoiding Contractor Disputes During Project Design
The New Jersey Transit Corporation is in the second phase of a billion dollar rebuilding program of its rail system. The first phase, which featured electrification and signal system replacement,...

Proper Specifying with the Or Equal Clause
'Or Equal' product specifications are the subject of this paper and shown to be frequently involved in quite serious contract disputes. Management strategies...

Constructibility Review of Documents Before Bidding
Many claims have their inception at the very beginning of a project, specifically at the time of bidding. Contractors review the Contract Documents prior to bidding. The way in which they...

Better Design Documents Through Constructibility Review
The Corps of Engineers (Corps) improves the quality of design documents by an extensive program to review in-house and Architect/Engineer (A/E) designs. This review is composed of several...

The Printed Word: A Defense Against Liability?
Design professionals should endeavor not to write burdensome or inaccurate contracts; i. e. , those that inaccurately describe duties. Inspector liability is not relieved by ambiguity...

Construction Inspection?The Last Line of Defense
Construction inspection, or a quality assurance program, is typically the last line of defense in relation to claims for the constructed project. The quality assurance team should be a...

An Owner's Role in Dispute Avoidance & Resolution
Construction disputes can be avoided in number and severity through education of the project team. This paper will identify a variety of ways an owner can avoid disputes, pinpointing reasons....

The American Association of Cost Engineers Claims Project
Construction contract disputes, or dressed in their popular nomenclature, 'contract claims', have become an established aspect of the non-residential construction...

Forecasting the Demand for Electricity: An Examination of Alternative Approaches
This paper examines several approaches to forecasting national-level electricity demand. The various approaches are briefly examined, and the strengths and weaknesses of each are discussed....

Private Funds, Public Projects
Tapping private sources for public services is not new, though the concept has advanced from traditional contracting for services, which has been around since pre-Revolutionary War days....

Making Computerized Project Control Systems Work?Background
Control systems can be considered as consisting of five major elements. These are: establish the objective or standard to be achieved-quality, maximum duration, resource utilization, maximum...

Construction Contractor Cost Control
Cost control for a contractor engaged in a fixed-price construction contract encompasses all actions directed toward the controlling or influencing the cost outcome of the project. When...

Control of the Design Process
Gilbert/Commonwealth, Inc. (G/C) was the architect-engineer for the original design of the Florida Power Corporation (FPC) Crystal River Nuclear Plant, Unit 3 (CR3) and has been involved...

Project Management Software: What Is in the Future?
This paper predicts the future of project management software and provides a discussion of the assumptions made to develop these predictions. It provides a flexible framework for future...

Computers on the Project Team
This paper presents the utilization of various computer technologies as an integral part of the project team at a large multi-discipline Architectural/Engineering firm. Technologies discussed...

Painless Method of Using Computers in A/E Firms
There is now an efficient and economical method of using computer technology in a small A/E firm. The recent advances in microcomputer technology have made it possible to take advantage...

Administrative Aspects of Project Software
This paper reviews the various aspects of administering the development, control, and use of computer software employed to support the design office in the administrative and technical...

 

 

 

 