Reliability-Based LRFD for Transmission Structures
A simple reliability-based Load and Resistance Factor Design (LRFD) method is proposed for the structural design of electric transmission lines. With the proposed method, the designer...

Evaluating Data Collectors as a Surveying Tool
Data collectors play an increasingly important role in surveying. The data collector serves as an interface between the total station and the computer and as an electronic assistant to...

Database Management
Computer aided design systems have found widespread acceptance from Engineering companies as drafting/detailing/drawing tools. While this has brought a dramatic productivity improvement...

Automated Walking Cycle for Swinging Ladder Dredge
The unique application of a Swinging Ladder Dredge to perform maintenance dredging in the cooling canal system of the Turkey Point Power Plant demanded the design of a semi-automated dredge...

Mixed Layer Modelling of Stratification in Lakes
Mathematical models for vertical heat transfer processes in lakes and reservoirs are grouped into two classes: diffusion models and mixed layer models. In recent years much of the progress...

Numerical Modeling of Flow in Hydropower Intakes
To reduce high mortality of downstream migrating juvenile salmon at hydraulic turbines, traveling screens are used to guide the juveniles into a bypass channel for safe passage. However,...

Hydraulic Testing of a Large Make-Up Pipeline
A 37 mile pipeline which consists of sections of 114 inch, 96 inch and 66 inch pipes was constructed for delivering secondary sewage effluents for power plant makeup. During initial operations,...

Hydraulic Analysis of Water Transmission Flowing Party Full
The hydraulic behavior of a transmission line that flows full along only part of its length is more difficult to analyze than a completely full line. Unsteady open-channel and closed-conduit...

Hydrotest Rupture of Penstuck Liner at Bath County
Bath County is the construction site of Virginia Electric and Power Company's pumped storage project. Rupture of a penstock liner during hydrotest at high pressure threatened...

Instruments Detect Dam Movement During Construction
Recent attention has been given to retrofitting electrical generation facilities at existing dams. Maintaining a safe structure during construction, and accomplishing this within a budget...

Valuable Design Insights Derived from Construction and Operation of Kinzua Dam
A number of design alternatives have surfaced during more than 17 years of operating experience at Kinzua Dam which should be useful in the design, construction, and operation of other...

A Nebraska Power District's Experience in Stabilizing by Silt Injection
The structures, rolled earth and concrete, of the Central Nebraska Project are constructed on foundations of loessial soils that range from a few feet to more than 100 feet in depth. The...

Numerical Modeling of Downstream Impacts Resulting from Hydropower Operations
Hydropower peaking operations often have downstream impacts that require an accurate assessment. A one-dimensional implicit finite difference numerical model has been used to accurately...

Intake-Shoaling and Pump-Vibration Problems
Iowa Generation's Council Bluffs Unit 3 circulating water-intake structure has experienced two major problems: (1) formation of sand bars in front of the trash racks during...

Operating Experience--Fine-Mesh Traveling Screens
Start-up and operating results for a new screenhouse at the Prairie Island Nuclear Generating Plant, 50 miles (80 km) downstream from Minneapolis/St. Paul, are compared to design assumptions....

Japanese Experience with Intake Designs
To diversify its power sources, Japan has operating or under construction some 37 nuclear power units. This technology and the design criteria are imported from the U. S. The power plants...

Movable-Bed Model Investigation of Littoral Drift on the Intake and Outlet of Lin-Kou Power Plant (I)
The establishment and operation of a distorted movable-bed model of the cooling water intake and outlet is described. The model employed is a three-dimensional movable-bed Froude model...

Physical Hydraulic Modeling for a Small Hydroelectric Redevelopment
In the development of a small hydroelectric project, the operating head on the plant is usually limited. On these projects, the need to minimize head losses and eliminating other factors...

Unsteady Mixing of a Buoyant Jet into a Reservoir
A buoyant effluent was dyed with fluorescent dye on two occasions to determine its mixing characteristics and flow path through a small hydropower reservoir located in south central Arkansas....

Thermal Breakup Predictions on a Regulated River
The thermal breakup process which occurs on the Peace River in Alberta, Canada is described. A quantitative technique which uses the energy budget to explain the celerity of the breakup...

 

 

 

 

Return to search