The Effects of Earthquakes on Power and Industrial Facilities and Implications for Nuclear Power Plant Design
Fifteen earthquakes, ranging from magnitude 5.2 to 8.4 on the Richter scale that have occurred in five countries since 1952, were studied. This report documents the performance of power...
Bright Lights Over China
The financing for Guangdong province's newest 700 mw coal fired electric power station came from a syndicate of 46 banks from 11 countries. The steel for the turbine generators...
Construction Guide Liners
Geomembrane liners for waste construction require meticulous construction, monitoring and weather watching. With much concern over the longevity of geosynthetics, many overlook the extreme...
Digestor Do-Over
Digesters at 6 Orange County (Calif.) wastewater treatment plants needed drastic odor control rehabilitation. Repairs included epoxy patching to cracked domes, installation of a geomembrane...
Journal of Performance of Constructed Facilities
The Journal of Performance of Constructed Facilities attempts to improve the quality of the constructed product through interdisciplinary communication. Papers examine the causes and costs of failures...
Observations and Experiences of Bulb Turbines
This article gives a short historical review of the introduction, construction and development of bulb turbine plants in Sweden. The article relates some of the experiences of the designers,...
Performance Study of the Lagoon at Inuvik, N.W.T.
Since 1957, Inuvik's sewage has been discharged into a lagoon situated northwest of the townsite. In 1982 the lagoon was upgraded to a two-stage system. Two primary cells...
Evaluation of Sewage Treatment Requirements in Cold Regions: Case Study?City of Whitehorse
This paper describes a method available for evaluating sewage treatment requirements in cold regions. The City of Whitehorse wastewater management situation has been used as an example...
Frazil Ice Problems in Intakes at Montreal
Intakes located in reaches of the St. Lawrence River that stay open all winter can be subjected to frazil ice formation for nearly three months. The City of Montreal intake is a key example...
Geotechnical investigation: Cominco's Red Dog Mine Facilities
The siting of major facilities associated with development of the Red Dog Mine Complex in Northwestern Alaska on relatively warm permafrost soil and rock presented geotechnical engineers...
Permafrost: A Suitable Landfill Containment Barrier
Ice-rich permafrost is a suitable medium for the containment of wastes. The combination of frigid dry Arctic climate and the impermeability of ice-cemented permanently frozen ground can...
Innovative Solutions to the Challenges of Heavy Civil Projects
Each heavy construction project presents unique conditions and challenges. For large projects, the work scope may justify an extensive engineering analysis and significant investments...
Demands and Means for Construction Innovation
Increasing complexity of the facilities owners need, increasing concern by owners regarding the cost effectiveness of investments in constructed facilities, and growing capability and...
Failure Investigations for Forensic Engineering
Failure investigations related to construction Industry is described in detail in the article. A failure investigation is one of the most demanding of engineering undertakings. It requires...
Construction Insurance: An Alternative Unified Risk Insurance
The transfer of risk mechanism (insurance) can be applied to solve problems unique to the construction environment. The proposed program is worthy of support since all segments of the...
Fault Diagnosis of Hazardous Waste Incineration Facilities Using a Fuzzy Expert System
The use of an expert system along with fuzzy fault tree analysis is discussed in connection with fault diagnosis of a hazardous waste incineration facility. This fault tree is a diagrammatic...
An Expert System for Inactive Hazardous Waste Site Characterization
The area of hazardous waste management is a broad and multidisciplinary field requiring expertise in engineering, geology, chemistry and toxicology, and is an ideal area for the application...
Planning and Budgets in the Construction Industry
In the ever changing and volatile construction industry it is becoming more necessary for the General Contractor and major subcontractors to become businessmen as well as engineers. This...
A Salt Solution for Nuclear Wastes
The Department of Energy's Waste Isolation Pilot Plant in Southeastern New Mexico is the nation's first full-scale facility for disposing of radioactive waste...
The Asbestos Impasse
Removing asbestos from the nation's buildings is a major task . Consulting engineers can play an important part in the process, locating and quantifying the carcinogenic material,...
Return to search