Verdict Rendered
After the Grays Harbor County Courthouse in Montesano, Washington, was severely damaged by an earthquake in 1999, the surrounding community decided to preserve it. A design/build approach...

The Viable Alternative
The Benicia-Martinez Bridge is a high-level, welded deck truss bridge that carries Interstate 680 over the eastern end of the Carquinez Strait near San Francisco. To bring the bridge into...

Design Live Loads for Parking Garages
The objective of this research project is to obtain a better understanding of parking garage live loads and to recommend an appropriate value for design. A load survey was conducted in...

Evaluation of KeySystem I Retaining Wall
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF Innovation Center. This report describes an evaluation to determine...

The Rationale for Above-Surface Facilities
The redevelopment of the U.S. Amundsen-Scott South Pole Station�currently in the beginning phases of construction�will include the largest and most ambitious example of an elevated station...

Defining the Manual's Audience, Content, and Level of Detail
Often, the technical writers assigned to prepare an O&M manual aren't technical writers at all, but members of the facility design engineering staff. While they may...

Irrigation Method Selection Process
Intelligent selection of the irrigation method that best meets the goals and objectives of an irrigated agricultural development is of primary importance in the design process. A system...

Evaluation Findings for Dynamic Isolation Systems, Inc. Elastomeric Bearings
This report, Evaluation Findings for Dynamic Isolation Systems Elastometric Bearings, presents the results of a detailed evaluation for one...

Holding Court
Contractors had their work cut out for them when structural engineers specified concrete-filled steel tubes for the Thomas F. Eagleton Federal Courthouse's perimeter columns....

Glass Rebar's Growing Pain
Although engineers have used glass fiber reinforced polymer (GFRP) reinforcing bar in applications as diverse as winery roofs and bridge decks, a lack of standards and understanding by...

Cable Access
By moving the expansion joints off the main, cable-stayed span and creating innovative cable connections and tower configurations, Parsons Brinckerhoff Quade & Douglas Inc. (PB)...

Yesterday's Data�Tomorrow
Before the advent of computer-aided design (CAD) and geographic information systems (GIS), keeping documentation for future usage was no problem. All an engineer had to do was make sure...

Into the Fourth Dimension
A team of contractors designed a pharmaceutical plant entirely in 3-D CAD, then linked the renderings to a cost program and scheduling software, adding a fourth dimension�time�to the process....

Analysis, Design, Construction, and Testing of Deep Foundations
This proceedings, Analysis, Design, Construction, and Testing of Deep Foundations, consists of papers presented at the OTRC `99 Conference...

Metal Building Systems: A New Look
The use of metal building systems in low-rise, non-residential construction under 150,000 square feet has grown from less than 50 percent in 1986 to almost 70 percent today. Such systems...

Resolution Solutions
Disputes over such issues as change orders, extra work, delays, or defective work are an inescapable part of the construction process. By designing an effective dispute management program...

Dynamic Groundwater Remediation Design with Genetic Algorithms
In groundwater remediation design it has been shown that dynamic policies, in which the pumping strategies may vary throughout the remediation period, can result in more cost-effective...

Sensitivity of Stormwater Conveyance System Cost to Design Recurrence Interval
(No paper) The cost of a piped and/or swaled stormwater system is determined principally by the storm recurrence interval (e.g., 5-year design storm) used to design it. That is, the present...

Environmental Restoration and Management of the Tres Rios Demonstration Constructed Wetland Project: Mosquito Monitoring, Control and Management Efforts
(No paper) The Tres Rios Demonstration Constructed Wetland Project in Phoenix, Arizona, is providing valuable information on the role of constructed wetlands in ecosystem restoration,...

A Leadtime Driven Flood Warning Response Plan Design
(No paper) The paper examines the optimal combination of predictive and detective capabilities in the development of the Wickenburg Flood Response Plan and extrapolates those findings...

 

 

 

 