Tying Back a Landslide
A slope covered with landslide debris is never the most desirable site on which to build, but sometimes it is the only one available. For the Forks of Butte hydroelectric power project,...
Manholes and Microtunneling
Contractors are for the Oakwood Beach Interceptor Sewer Project, on Staten Island, N.Y., were having difficulty. Glacial tills and a high water table made working 90 ft below the ground...
Put to the Test
In the construction industry, the concept of life-cycle cost applies not only to the infrastructure itself, but to the materials that go in to building that infrastructure. To improve...
Settling Down Easy
In order to more fully participate in the international and Asian Pacific aviation network, it was decided to establish a highly efficient 24-hour a day operation at the New Kansai International...
Underground Research: Here and There
Geotechnical research in Europe, Japan and the U.S. were compared in a study funded by the National Science Foundation. Visits to research facilities and several surveys resulted in two...
Rethinking the Competitive Bid
Concern that the U.S. construction industry is losing its competitive edge is nothing new. Ironically, the problem is not so much rooted in foreign technical expertise as it is in our...
Rebuilding an Illusion
A dam that controls the level of Fall Lake, a major entry to the Boundary Waters Canoe Area Wilderness of northern Minnesota had to be rebuilt, but federal agents barred constructors from...
Under the Undersea World
Soil conditions in New Orleans are generally unfavorable to the construction of large structures, and exceptionally so along the Mississippi River banks, which tend to slide. But that...
Dome Over Orlando
The article describes Orlando's new City Hall, a 267,000 sq ft nine-story reinforced concrete tower, clad in granite-aggregate precast concrete panels and topped by a 120...
School Is In Session
Cost overruns, project delays and the city bureaucracy have given school construction a bad reputation throughout the U.S., particularly in urban centers. But as other construction markets...
Sending Steel Down the River
Completed last October 1990, the Roosevelt Lake Bridge is now the longest two-lane, single span, steel-arch bridge in North America, spanning 1,080 ft. Also, the longest steel arch bridge...
The Effect of Loading Rate on the Bending Strength of Alluvium Reinforced Ice
Traditional building materials are often less than ideal for construction in remote Arctic locations. Their mechanical properties may be degraded in extreme cold, and costs associated...
Sludge Dewatering in Freezing Beds
This paper summarizes the results of laboratory and pilot scale studies on the development of the sludge freezing bed. Laboratory studies indicated that a freezing bed could dewater up...
Winter Sewer Construction in Campbell Lake
This paper discusses the winter construction for replacement of the Campbell Lake portion of the Campbell Creek C-5 Trunk (C-5 Trunk) located in Anchorage, Alaska (see Figure 1). A previous...
Experimental Study of Adfreeze Heaving of Augered Caisson Footings
In order to establish the required depth of augered caisson-type footings in cold regions and their optimal design against adfreeze heaving, an experimental field investigation has been...
New Admixtures for Cold Weather Concreting
Chemicals were tested for their ability to promote strength gain in portland cement concrete at low temperature. The admixtures depressed the freezing point of the mix water and accelerated...
High-Performance Concrete in All-Weather Deck Pours
A high-performance concrete mix enhanced with a combination of microsilica, superplasticizer, and high dosages of an corrosion-inhibiting, accelerating admixture (calcium nitrite); proved...
Impact of Cold Weather on Building Construction Scheduling
Weather impact on a building construction schedule is often significant in cold regions. Most deterministic scheduling methods are unable to directly account for the effects of weather...
Processed-Snow Foundation Design at the Summit of the Greenland Ice Cap
The design and construction of a processed-snow foundation berm for an elevated building located at the summit of the Greenland Ice Cap is described. Weather conditions and design provisions...
Environment One: A Master Plan Study for a New Scientific Research Station at the Geographic South Pole
The existing research station at the geographic South Pole is approaching the end of its useful life. This master plan study focuses on determining the technical and functional requirements...
Return to search