Design of a Mechanical Refuse Barrier
In the summer of 1988, beachgoers flocking to the New Jersey shore for relief from unusually hot, hurried weather were stunned by the grisly spectacle of hospital debris, industrial and...
Wave Forecasting for Construction in Mobile Bay
Wave heights were forecast for day-to-day pipeline construction operations in the Main Pass area of Mobile Bay. A low-cost forecasting procedure was developed using the wave generation...
The Talbert Channel Ocean Outlet Project
The Talbert Channel Ocean Outlet Project consisted of relocating and enlarging the outlet of a relatively narrow, shallow flood control channel in Southern California. Noteworthy aspects...
Design Considerations for Small Artificial Islands in Franks Tract, California
Small, artificially-created islands may provide significant recreation and habitat benefits. Costs, however, can also be high. The initial dollar cost of creating an artificial island,...
Application of Extremely Low Altitude Photogrammetry for Monitoring Coastal Structures
Extremely low altitude mapping photography exposed from a helicopter is showing considerable promise in providing another method of extending the many benefits of photogrammetric data...
The Application of Technology to Solving Practical Problems
In this paper, the roles of the scientist, technologist, engineer, and manager are discussed to place them in perspective. A distinction is made between the coastal engineer' and practicing...
Role of the Coastal Engineer in Civil Engineering Practice
Coastal engineering is a specialized discipline of civil engineering that encompasses a wide variety of activities related to harbors, navigation, shore erosion and storm protection. Because...
Value Engineering in Coastal Design
A formal procedure of value engineering can be applied to coastal design to refine a design and reduce the construction costs. Despite the relatively simple technology and materials used...
Environmental Impact Analysis of Coastal Projects
It is fairly routine to describe the range of impacts that might occur as a result of a proposed improvement, but problems and controversy often accompany attempts to answer the more pressing...
Sandbridge Virginia Oceanfront Seawall Arbitration Hearing: Some Lessons Learned for Coastal Engineers
A group of beach property homeowners claimed that their new oceanfront seawall was defective in design. A beefed-up design cost about $1.3 million more and they sought this amount from...
Cost Effective Risk Allocation for Coastal Engineering Projects
Project participants will benefit significantly by routinely taking a more systematic, structured, and global view of risk than is sometimes done at present. Enhanced and broadened cognizance...
Coastal Engineering Design Codes in the Netherlands
Dutch research strategy on water defences and the resulting coastal and hydraulic engineering design codes (technical documents) are briefly overviewed. Special attention is paid to organizational...
Engineering a Monument, Evoking a Nightmare
Rather than simply standing as a backdrop for exhibits, the $53.2 million U.S. Holocaust Memorial Museum is intended to be part of the fabric of the exhibition itself. Now under construction...
A feasibility study for a Concrete Core Tomographer
This is a study of the feasibility of applying computer tomography in the study of concrete cores. A laboratory protocol is presented for testing concrete cores using a medical - grade...
Evaluation of Concrete Bridges by Impact-Echo
Strength of post-tensioned bridge structural members primarily depends on the tensile capacity of their post-tensioning steel reinforcement. To prevent corrosion, the post-tensioning steel...
Nondestructive and Destructive Testing of a Three Span Skewed R. C. Slab Bridge
A three span, skewed, reinforced concrete slab bridge was field tested to destruction by the authors. Before the actual destructive test, nondestructive tests were performed to determine...
Landfills: Anatomy of Automated Design
California's 360 acre Bee Canyon landfill (completed last year) sits amid a complicated network of narrow canyons with side slopes 300 ft high. As with most landfill projects,...
Value Engineering at a Superfund Site
The Helen Kramer Landfill ranked fourth on the EPA's National Priorities List and the estimated cost of clean up was about $39 million. By value engineering selected parts...
Grouting, Soil Improvement and Geosynthetics
The proceedings of the 1992 ASCE Specialty Conference on Grouting, Soil Improvement and Geosynthetics, addresses advances in the state-of-practice, research and technological developments...
Safeguarding Steel
U.S. bridges are caught in the money squeeze. Painting has become a luxury few public agencies can afford and complying with EPA regulations has escalated costs even more. The paint/coatings...
Return to search