Hydraulic Analysis of the McCook Outlet Manifold
A 1:40-scale model of the proposed McCook Outlet Manifold was tested at the U.S. Army Engineer Waterways Experiment Station (WES). Subsequently, flow conditions in the manifold were calculated...

Sedimentation and Flood Protection for the Lower Yellow River
The Lower Yellow River is known for its disastrous floods in the past. After 4 decades without major floodings, rapid economic and population growths along the River have drew concerns...

Analysis of Cabinet Gorge Dam
After a 1987 inspection of the Cabinet Gorge Dam, Part 12 consultants contracted by Washington Water Power (a private utility based in Spokane, Washington) made several recommendations...

Dam Safety Modifications for Clear Creek Dam Manuscript for ASCE Hydraulics Division 1993 National Conference on Hydraulic Engineering
Clear Creek Dam, an unsafe thin arch dam, was stabilized by constructing a concrete gravity buttress on the downstream face. During the Bureau of Reclamation's (Reclamation) Safety Evaluation...

Bartlett Dam Fuseplug Auxiliary Spillway
Bartlett Dam is located approximately 77 km northeast of Phoenix, Arizona on the Verde River. The Bureau of Reclamation (Reclamation) has determined that the structure is not capable of...

Current Legal Issues in Sedimentation
This paper represents the updating of Chapter 7 for Manual 54. There has been considerable change in legal rulings and precedent law since the first edition of Manual 54. Many of these...

Scour Analysis at Highway Structures
ASCE Manual 54 entitled, `Sedimentation Engineering' is being revised. In the revision, a chapter on `Scour at Highway Bridges' will be included. This paper will describe in general terms...

Hurricane Andrew in South Florida: Steps to Recovery and Lessons Learned
This is the second part of a two-part paper which analyzes the development and impact of Hurricane Andrew in South Florida. The paper specifically deals with the experiences of the South...

Reclamation's Review of Operation and Maintenance Program
The U.S. Bureau of Reclamation (Reclamation) is responsible for protecting the Federal investment in over 300 water storage and conveyance facilities in the 17 Western States. Reclamation's...

Comparison of Two Methods of Screening Bridges for Scour
Scour evaluations were performed for large numbers of bridges in two separate studies in New York and New Jersey. The two studies used different screening methods for identifying high-priority...

Case Studies of Bridge Scour in Western New York
As part of the New York State Thruway Authority's bridge hydrologic/hydraulic evaluation program, 63 structures over 42 stream crossings in western New York were assessed for scour potential...

Bureau of Reclamation Downstream Hazard Classification
An overview of the downstream hazard classification process used by the Bureau of Reclamation (Reclamation) and other U.S. Department of the Interior (DOI) agencies for the safety of dams...

Using Threat to Life Studies to Guide Dam Safety Decisions
Ensuring that Bureau of Reclamation (Reclamation) dams do not present unacceptable risks to public safety, prosperity, and welfare serves as a primary objective of Reclamation's Safety...

Economic Aspects of the Bureau of Reclamation Safety of Dams Program
The paper briefly examines economic aspects of the Bureau of Reclamation (Reclamation) Safety of Dams (SOD) program evaluation process. Procedures described include the downstream damage...

Scour Prediction Model at Bridge Abutments
A model to predict local abutment scour is presented. The model is based on a large number of laboratory experiments over the past half century. The dependent variable, a ratio that includes...

Bridge Abutment Scour in Compound Channels
Experiments are reported which quantify the effect of channel geometry on local scour at abutments for bridges crossing compound river channels. The channel geometry effects are represented...

Design of Riprap Stilling Basin for Overhanging Pipe
The rock rip-rap basin is the most common and economical method of handling the problem of scour at a pipe outlet. The advantage of the method is speed of construction, absence of the...

Bank Stability Analyses Versus Field Observations
The concept and process of stream bank stabilization design through the development and use of limiting stability curves for the comparison of existing bank height/angle combinations to...

Computation of Flow Past a Cylinder Mounted on a Flat Plate
The surface shear stress distribution in the vicinity of a circular cylinder - mounted normal to a rigid flat plate - produced by the three-dimensional flow past it, is investigated numerically...

The Influence of Exposed Footings on Pier Scour Depths
Data compiled from past test efforts are combined in this article with the results of two new flume test studies. The combined material, presented graphically, suggests a method for adjusting...

 

 

 

 

Return to search