Remedial Grouting at Calero Dam
This paper describes the design and construction of a remedial grout curtain to resolve a long-standing seepage condition at Calero Dam, located at the south end of the highly-populated...
Ultrafine Cement Tests and Drilling Warm Springs Dam
Ultrafine cement was chosen by the Corps of Engineers for tertiary grouting the Warm Springs Dam because of its ultrafine particle size, low settlement, medium viscosity and longevity....
Experimental Evaluation of Reservoir Bottom Remediation Material
Open trenches developed through a compacted clay liner on the bottom of a reservoir. An experimental investigation has been conducted to evaluate the feasibility of using silt-sized, nonplastic...
Geotechnical Modifications at Meeks Cabin Dam
This paper presents a summary of the geologic and geotechnical evaluation of a potential piping deficiency identified at Meeks Cabin Dam as well as description of remedial measures and/or...
General Design and Construction Considerations for Remedial Seepage Control
All earth and rock-fill dams are subject to seepage through the embankment, foundation and abutments. Methods for remedial seepage control include storage restriction, grouting, upstream...
The Use of Post-Tensioned Anchorages on the Arch Portion of Stewart Mountain Dam, Arizona
Post-tensioned rock anchorages were selected by the Bureau of Reclamation (Reclamation) to stabilize Stewart Mountain Dam against potential seismic loadings. The use of such anchorages...
A Review of Drilling and Grouting Methods for Existing Embankment Dams
With the increasing emphasis being placed on dam rehabilitation and repair, more dam engineers are faced with the need to interface with drilling and grouting specialists. Regretfully,...
Remedial Design and Construction to Improve a Sliding Embankment
The paper describes the studies made to identify the nature of possible remedial measures such as improved drainage, removal of the weak clay layer or a provision of a buttressed dam....
Coolidge Dam Abutment Stability and Stabilization
This paper focuses on left abutment stability assessments and stabilization measures at Coolidge Dam, Arizona. Initial assessment of abutment stability was based on limited rock strength...
Conversion of a Concrete Slab and Buttress Dam to a Gravity Dam
The 58-foot high, 425-foot long, Ambursen-type, concrete slab and buttress, Gorge Plant Dam, which has a 120-foot long overflow spillway near the center, was converted to a concrete gravity...
Seismic Stability Modification Designs for Embankment Dams
The Bureau of Reclamation (Reclamation) has recently designed rehabilitations for four embankment dams to ensure their seismic stability. A fifth project is scheduled for construction....
Liquefaction Potential Leads to Dam Reconstruction
Results of a visual inspection of the Dundee Dam conducted in 1982 revealed the presence of seepage on the downstream toe of the left embankment. Subsequent subsurface explorations and...
Using Innovative Technologies and Geosynthetics in Embankment Dam Rehabilitations
The ever increasing development and confidence in new and innovative technologies such as geosynthetics, in conjunction with often significant economic advantages, have led designers to...
Stability of Embankments, Fills and Structures at the Bad Creek Project Under Static and Dynamic Loading
Duke Power was faced with the problem of using explosives to assist in removing a sensitive, saturated embankment cofferdam supported on a large rock plug. The first phase of the work...
Construction and Verification of Ground Improvements at Mormon Island Auxiliary Dam
Mormon Island Auxiliary Dam, part of the Folsom Dam and Reservoir Project near Sacramento, California, is founded on alluvial materials that were dredged and processed for gold on several...
Trial Lake Dam Reconstruction
Trial Lake Dam is located in the Uinta National Forest in Central Utah at an elevation of about 10,000 feet. The dam is 50 feet high and stores 1,700 acre-feet of water for downstream...
Dam Safety: A State's Perspective
The State's role in the rehabilitation of dams is discussed. The author presents a national picture of dam safety, describes some dam failure statistics on type of dams that have failed,...
Seismic Safety Modification of an Old Earthfill Dam
Chollas Dam was built as a water supply reservoir for the City of San Diego. The reservoir is no longer a part of the municipal water system but has been operated since 1966 as a recreational...
Development of High Performnance Shotcrete (Theoretical Considerations)
This paper presents some theoretical considerations for studies on high performance wet-mix shotcrete. A new laboratory shotcrete pump and rheometer are being developed to study the effects...
Accelerator for Shotcrete Based Amorphous Calcium Aluminate
The authors developed an accelerator based on amorphous cacium aluminate named NATMIC for shotcrete. In Japan, accelerator based amorphous calcium aluminate are widely used in shotcrete...
Return to search