Evaluating a Proposed Right-of-Way for PCCP
Corrosion Control of Prestressed Concrete Cylinder Pipe
Extending the Life of Prestressed Concrete Cylinder Pipe with Pulse Cathodic Protection
External Corrosion Control of Water Mains to Maximize Operating Life
Internal Inspection of 20-Inch Natural Gas Pipeline
The Use of Submersible Remotely Operated Vehicles for the Inspection of Water-Filled Pipelines and Tunnels
Seismically Upgrading the Mokelumne Aqueducts
Seismic Design of Puerto Rico's North Coast Superaqueduct
Case Study: Crossing of Existing PCCP Aqueducts A and B, Southern Nevada Water Authority Las Vegas, Nevada
Pipe Joint Failure Caused by an Inadequately Specified Constructed Environment
Unified Design Methodology for Most Pipeline Materials
Acoustic Monitoring of Prestressed Concrete Cylinder Pipe
An Update on Acoustic Emission Testing of PCCP
Pipeline Rehabilitation and Repair
Horizonatal Directional Drilling with Ductile Iron Pipes
Municipal Infrastructure: Innovative Trenchless Replacement Method Utilizing Bell-Less Ductile Iron Pipe, Case Studies
Geotechnical Investigations for Tunneling & Pipe Jacking
Role of Surge and Possible Mitigation in PCCP Design
Large Diameter Reinforced Concrete Pipe Bedding Design and Installation in Adverse Soil Conditions
Evaluation of New Installations for Concrete Pipe
Return to search