Innovative Techniques in Permit Compliance Monitoring and Enforcement
The development of offshore petroleum resources has brought extensive onshore industrial development to Santa Barbara County. The County's chief mechanism for requiring project...

The Cost of Regulatory Concerns Associated with Petroleum Development in the Arctic
During the late 1970's and early 1980's, petroleum resources were developed in the central Alaskan arctic coastal zone. Governmental agencies mandated to protect...

The Massachusetts CZM Project Review Process
In 1978 the Massachusetts Coastal Zone Management Program (MCZMP) became the first CZM program on the East Coast to be approved by the U. S. Department of Commerce and is now in its ninth...

Port Facility Development: Public Access and Mitigation Requirements
Coordination of compatible uses and resolution of use conflicts requires continuous effort, extending beyond the planning and permit process and requiring long-range committment of staff...

Tiered Sediment Quality Evaluations for Dredging Projects
Sediment and water quality are evaluated frequently for U. S. Army Corps of Engineers (CoE) dredging projects to assess potential biological effects, as required for compliance with environmental...

A Design rReview Board's Role in Developing Public Access
In the past 20 years, the Bay Commission, through its permit process, has required that new public access be provided along more than 100 linear miles of the shoreline of San Francisco...

Coastal Dune Status and Management Conflicts, New South Wales, Australia
The University of Sydney/Soil Conservation Service dune management research project was initiated with the ultimate goal of developing a multiple-objective planning model to define the...

Electronic Gymnastics
Efforts are being made to have all the parties to a project share the same, current information. In order to do so, civil engineering firms are jumping through electronic hoops to get...

Computers: What Do Students Need to Know?
This article is based on interviews with three professors at three universities, a recent graduate from each school, and the graduate's employer. The interviews show that...

Case Studies?Semi-Closed Pipeline Systems
The paper discusses the title subject in terms of automated systems, flexible scheduling, and system components. Project locations include the Mahaweli Development Project, Sri Lanka;...

Data and Control Communication Methods for Delivery System Operations
The selection of a communication system for the automation of a canal system requires careful consideration of the type of canal system operation desired, the location of the facilities...

Economic Analysis of Irrigation Rehabilitation Projects
This paper discusses the assessment of the costs and benefits of irrigation rehabilitation and modernization projects. It summarizes the methodology used at the World Bank to assess the...

Imbrication of Tabular Boulders
Analysis of moments on tabular boulders projecting into a uniform stream indicates that a tabular boulder dipping downstream is unstable and can be overturned by velocities expected during...

Preliminary Engineering Design of an Artificial Tidal Lagoon System in Kuwait
A coastal resort project was planned for a 30 hectare site along the Arabian Gulf approximately 69 km south of Kuwait City at Dubaiyeh. The master plan, originally developed by Kuwait...

Methods for Specification and Verification of Hydraulic Design in a Turnkey Construction Contract
The project site is at the Hannibal Locks and Dam at New Martinsville, West Virginia. The existing project, a Corps of Engineers' (Corps) facility built in the 60's...

Development of a Monitoring Program and Vegetative Restoration Project in a Mississippi River Bendway
The Dry Bayou-Thompson Bend area is located on the right descending bank of the Mississippi River between river miles 4. 5 (7. 2 kilometers) and 30. 0 (48. 3 kilometers) above the confluence...

Choices Between Micro and Mainframe Computers
The explosion of microcomputers (PCs) has shifted a great amount of engineering computing from mainframes to micros. It has also shifted a lot of programming from FORTRAN to BASIC. This...

Subsurface Drainage System for the Klamath Project
The U. S. Bureau of Reclamation's Klamath Project was authorized in 1905 for irrigation purposes. A subsurface drainage system was constructed in the public lands within the...

U.S. Bureau of Reclamation: How Irrigation Projects are Sized
The objective of this study was to review the methods presently used by the United States Department of Interior, Bureau of Reclamation (Bureau) to estimate the water requirements for...

The Relationship of Benefits to System Size for Irrigation Projects
This paper presents a generalized linear programming (LP) and farm budget model for optimization of on-farm irrigation benefits resulting from variations in irrigation project size. The...

 

 

 

 

Return to search