Automated People Movers IV
This proceedings, Automated People Movers IV, includes 72 papers presented at the Fourth International Conference on Automated People Movers...

Geographic Information Systems and their Application in Geotechnical Earthquake Engineering
This proceedings, Geographic Information Systems and their Application in Geotechnical Earthquake Engineering, consists of short papers submitted...

Waterpower '93
This proceedings contains the papers presented at the Waterpower '93 conference held in Nashville, Tennessee, August 10-13, 1993. The conference brought together owners, planners,...

Vietnam: Worth Looking Into
If it is to enter the world economy, let alone play catch-up with the booming economies of some of its neighbors, Vietnam requires massive numbers of infrastructure projects: roads, bridges,...

Engineering Sustainable Development
Despite some isolated environmental victories in the past few decades, on a system-wide level the problems�from acid rain to destruction of the rain forest�are getting worse. Can humanity...

Guidelines for PC-Based Data Acquisition Systems for Hydraulic Engineering
Guidelines for PC-Based Data Acquisition Systems for Hydraulic Engineering reviews the state-of-the-art in personal computer-based data acquisition...

Reclaiming Clear-Cut Land
The Savannah (Ga.) Airport Commission needed to expand the city's international airport to meet projected needs through 2007. The expansion was designed with Greiner, Inc.,...

Tying Up The Artery
After six years, preliminary design is almost complete on one of the nation's largest, and most complicated, public works project, the Boston Central Artery project. At an...

Airport Towers: A New Generation
Airport control towers are a unique building type with monumental significance, both for the cities that own and operate the airports, and for the FAA which owns and operates them. Airport...

So Much Pavement, So Little Time
At its most basic, pavement management requires taking inventory of a pavement network, doing a condition assessment, setting up a database, then synthesizing the data collected for an...

Harry Seed, Liquefaction & the Gravel Drain
The late Professor Seed of the University of California at Berkeley established criteria for gravel drain design in a 1977 ASCE paper. Without historical proof for its viability in a real...

Egypt's Real-Time Water Management
The challenge and complexity of efficiently managing the distribution of the 55 billion m that Egypt draws from the Nile every year has prompted the country's Ministry of...

Geosynthetics Conquer the Landfill Law
Los Angeles' last operating landfill is undergoing a major expansion using innovative materials in the liner system to overcome difficult site conditions. The design represents...

Overcoming the Woes of Worldwide Work
The author, a civil engineer based in Gibraltar, discusses a variety of pitfalls encountered in international practice, with case histories and lessons learned. They can be caused by differences...

High-Performance Construction Materials and Systems
An Essential Program for America and Its Infrastructure?Executive Report
Prepared by American Concrete Institute; American Institute of Steel Construction; American Iron and Steel Institute; ASCE; Civil Engineering Research Foundation; Concrete Research and...

Experience with Beach Fill Equilibration and Recommended Design Guidelines
Well documented engineering procedures suitable for determining design berm dimensions subsequent to profile equilibration appear to be lacking. Failure to properly account for cross-shore...

Scour Hole Development and Stabilization at Shinnecock and Moriches Inlets, New York
A scour hole developed inside the Shinnecock Inlet channel near the tip of the west jetty. Over the years, this hole deepened to about 70 ft below the mean low water level with the average...

Longshore Sediment Transport Rate at Morro Bay, CA
Estimates of sediment transport rate in the vicinity of Morro Bay Harbor are needed as part of an investigation of possible modifications to the existing Federal project. Because the site...

Design of a Mechanical Refuse Barrier
In the summer of 1988, beachgoers flocking to the New Jersey shore for relief from unusually hot, hurried weather were stunned by the grisly spectacle of hospital debris, industrial and...

Subaqueous Disposal Area Development and Mitigation
Development of subaqueous dikes on soft soils extensively utilized geosynthetics. The design adopted a wide-bermed embankment with high-strength geotextile for tensile reinforcement and...

 

 

 

 