Stability and Loads
This chapter examines stability and loads. Topics include stability and lateral load resistance during construction; effective lengths of cantilever columns; effect on stability of frame...
Progressive Collapse
This chapter examines progressive collapse. Topics include current practice and integrity steel for loss of support of a lifting collar....
Initial Considerations
The purpose of this section is to aid the line designers in developing their specifications for fiber-reinforced polymer (FRP) materials utilized in electric overhead line structures....
Materials and Manufacturing Processes
This chapter introduces the basic materials used in the manufacturing of composite structures. It will help the line designer in understanding how the different elements of the fiber-matrix...
Performance-Based Criteria for FRP Products and Materials
In most ways, fiber-reinforced polymer (FRP) structures perform similar to wood and steel structures. There are, however, certain differences and these differences are described in this...
Assembly and Erection
This chapter is intended to provide recommendations on transporting, handling, assembling, and erecting fiber-reinforced polymer (FRP) poles. An important consideration is that FRP poles...
Superior Court
For a sport obsessed with getting a round ball through a hoop, the shape of the new Naismith Memorial Basketball Hall of Fame seems entirely appropriate. The building is intersected by...
Evaluation of the Tricon Retained Soil Wall System
Prepared by the Highway Innovative Technology Evaluation Center, a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed to...
Recent Advances in Optimal Structural Design
Sponsored by the Technical Committee on Structural Design of the Technical Administrative Committee on Analysis and Computation of the Technical Activities Division of the Structural Engineering...
Evaluation of the Maccaferri Terramesh System Retaining Wall
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed...
Crossing the Yangtze
The Nanjing Second Yangtze River Bridge, which links two parts of the city of Nanjing, features the first use of an epoxy asphalt deck pavement in China and one of the longest cable-stayed...
Changing Lanes
The Rhode Island Department of Transportation (RIDOT) plans to relocate Interstate 195 in downtown Providence began as a safety improvement project but has since grown into an ambitious...
Preserving Pisa's Treasure
Pisa's bell tower, a prime example of Romanesque architecture, would be renowned even if it did not lean. Construction of the tower began in 1173 and was not completed until...
Deep Freeze
In engineering, overcoming a failure can sometimes be more instructive than completing a project with unqualified success. Such was the case with the collapse and repair of a force main...
Twin Crossings
The Hungerford Bridge actually comprises twin pedestrian bridges that are being constructed on either side of an operational 19th century railway bridge over the River Thames in London....
The Chernobyl Problem
When the infamous accident at the Chernobyl Nuclear Power Plant occurred in April 1986�a catastrophe that involved an explosion that blew off the top of one of the plant's...
Berm Breakwaters?Design, Construction and Monitoring
The philosophy of the fieldwork of Berm breakwaters was applied in Iceland. A few case histories were described with emphasis on quarry investigations, design, construction and monitoring....
Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...
Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...
St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...
Return to search