Computer Control of CSOs
Like many older cities, St. Louis has a combined sewer system and is faced with the difficulties of dealing with combined sewer overflows (CSOs). The Metropolitan St. Louis Sewer District...

Sludge Under Pressure
Few wastewater engineers ever have to deal with high-pressure pumping. In San Diego, however, city engineers will soon oversee a 100,000 ft long psi main that will transport sewage sludge...

Austrian Guideline and National Report on the Use of Shotcrete
The purpose of this guideline is the standardization of quality and a uniform procedure for the production and testing of shotcrete from the technical and engineering point of view. In...

Fast Foundation for Soft Clay
This article describes the detailed foundation work and high-capacity piling design for a flue gas desulfurization (FGD) retrofit system for the Lambton Generation Station in Ontario,...

Ductility Analysis of Overload and Settlement
The concept of sufficient ductility to avoid premature or brittle failures is gaining wide acceptance in structural engineering and is an important aspect in mitigating the consequences...

Prediction of Embankment Dam Breaching for Hazard Assessment
Downstream hazard assessments for dams require prediction of 1) whether a breach could form, and 2) the hydraulic characteristics of the breach for use in calculations of discharge and...

Rehabilitation of a Toe Drain
Old or improperly designed toe drains can cause trouble for embankment dams. Toe drains installed without proper filtering can provide an easy course for internal erosion and piping of...

Experimental Evaluation of Reservoir Bottom Remediation Material
Open trenches developed through a compacted clay liner on the bottom of a reservoir. An experimental investigation has been conducted to evaluate the feasibility of using silt-sized, nonplastic...

Geotechnical Modifications at Meeks Cabin Dam
This paper presents a summary of the geologic and geotechnical evaluation of a potential piping deficiency identified at Meeks Cabin Dam as well as description of remedial measures and/or...

Installation and Routing of Critical Embedments at the Hanford Waste Vitrification Plant
During the preliminary design phase of the project, a study was conducted to develop concepts for routing embedded piping and conduit between the remote cells and the service corridors...

Optimal Planning of Combined Sewer Rehabilitation
The need to rehabilitate many of the existing sewer systems to keep them operational is evident. The development of a rehabilitation plan that optimizes the use of funds is the first step...

Collection System Inspection and Rehabilitation Program
The Metropolitan Water Reclamation District of Greater Chicago is a regional wastewater and water resources agency responsible for serving an area of about 875 square miles. Recently the...

Global Approaches for the Nonconvex Optimization of Pipe Networks
Because the pipe network problem is nonconvex, two global search schemes, MULTISTART and ANNEALING, are employed to permit a local optimum seeking method to migrate among various local...

Pipe Network Optimisation Using Genetic Algorithms
A new optimization technique of generic algorithms has recently been successfully applied to pipe network optimization. In this paper a parametric analysis is carried out of the genetic...

Non Contact, Remote Sensing of Buried Water Pipeline Leaks Using Infrared Thermography
Subsurface water pipelines, sewer and buried utilities throughout America and the rest of the world range in age from hundreds of years old to brand new. They all have, however, one fact...

Urban Stormwater Runoff Control System?Village of Skokie, Illinois
Combined sewer systems in many communities lack the capacity to convey stormwater runoff from even small to moderate storm. This inadequate capacity, in turn, causes basement flooding...

Storage/Treatment Isoquants for CSO Control Planning
A quantitative procedure which identifies the technically efficient combinations of storage volume and treatment rate necessary to achieve various levels of combined sewer overflows (CSO)...

Combined Sewer Overflow Abatement Planning Based on SWMM EXTRAN Modeling
This paper discusses use of the Storm Water Management Model (SWMM), with the EXTRAN block as the hydraulic transport mechanism, as a tool for developing a facilities plan for abating...

Receiving Water Quality Bases for Evaluating CSO Control Alternatives
Waters receiving combined sewer overflow loadings in the vicinity of Bangor, Maine include the Kenduskeag Stream and the Penobscot River. The city's facilities planning effort was performed...

Application of the Storm Water Management Model in Evaluating Combined Sewer Overflows
This paper summarizes the application of the stormwater Management Model (SWW) to isolate the contributions of Combined Sewer Overflows (CSOs) to a receiving water. The CSO discharges...

 

 

 

 

Return to search