CAD and the Corps
CAD has been a near standard feature of engineering design for the last decade, but the U.S. Army Corps of Engineers has found that the way their installations have gone about designing...

The Use of Sophisticated Three-Dimensional Numerical Models in Weather Modification Efforts
Understanding of the complex interactions between the mesoscale and cloud environment and between microphysical and dynamical processes within clouds can be substantially increased with...

Planning, Design and Integration of a Computerized Terminal Operating System
NYK Line's new terminal at the Port of Los Angeles (photograph below) features innovative design and advanced terminal operating system integration....

Planning/Analysis of VPA's Norfolk North Terminal
The Virginia Port Authority (VPA) is developing a new marine container terminal on the northern portion of its land at Norfolk International Terminals (NIT). The terminal is to be designed...

A Computational Berthing Model for the Design of Fender Systems
The IRF numerical model has not been widely applied to the design of fender systems although the method has been extensively confirmed by hydraulic model tests and partially verified by...

Honolulu Harbor Ship Traffic Simulation and Animation Study
A computer simulation and animation study was conducted to investigate the operational impacts of projected ship traffic increases and harbor reconfiguration specified in the Honolulu...

Los Angeles-Long Beach Harbors Model Enhancement Program
In response to the expansion of oceanborne world commerce, the Ports of Los Angeles and Long Beach, California, in coordination with the Los Angeles District of the U.S. Army Corps of...

Unit Hydrograph Derivation Using Geographic Information System
Geographical information system (GIS) data management and processing functions are used to develop synthetic unit hydrographs using input data consisting of digital elevation models (DEM)...

Use of Interactive Simulation Environments for the Development of Negotiation Tools
Interactive computer programs have been used successfully for many years to facilitate the planning and operation of water resources. Recently, advances in computer software have made...

Use of Interactive Simulation Environments for Evaluation of Water Supply Reliability
This paper investigates physical performance measures and their practical application to a regional water resource system for western Washington. Specific criteria for characterizing the...

Computer-Aided Support for Water Quality Modeling of the Russian River
A computer-aided support system for operation of the QUAL2E-UNCAS modeling packaged has been developed for modeling of the Russian River, California. The system has been created under...

A Decision Support System for Water Quality Modeling
A prototype Decision Support System (DSS) has been developed to evaluate the environmental and economic consequences of alternative farming practices. This system was developed to help...

Modified QUAL2E Modeling of a Stream Acutely Impacted by Photosynthesis and Respiration
The QUAL2E model was modified to account for time variable headwater conditions and the photosynthesis and respiration of attached aquatic plants. With these modifications, a stream that...

Estimating Urban and Suburban Sewage Flows with Assistance of GIS Technology
The Massachusetts Water Resource Authority (MWRA), an agency created by the Massachusetts legislature to provide wholesale water and sewer services to the metropolitan Boston areea, is...

Hydrologic Investigation of the April, 1983 Flooding in New Orleans, Louisiana
During the rainstorm of April 6-7, 1983, a shell ramp was constructed over State Highway 406, closing the relatively shallow depression formed by the roadway passing over the levee which...

Critical Public Issues for Well Head Protection
New Jersey adopted in 1991 a Well Head Protection Program Plan to provide added safeguards to water supply wells. Through extensive public participation efforts the Department of Environmental...

Extended Experience with a Short-Term Hydropower Scheduling Model in New England
The New England Power Exchange (NEPEX) is responsible for the central dispatch of power throughout New England. To assure the maximum benefits of power pooling, the electric facilities...

Planning and Operation of a Multi-Reservoir Water Distribution System
A water supply distribution system planning model (DSPM) is developed using a directed graph algorithm as its pre- and post-processors and a linear programming (LP) procedure as an `intelligent'...

Computer Modeling Responsibilities for Municipalities
Municipal organizations are often faced with a complex set of water resource problems which can best be analyzed through the use of computer models. The development of such models can...

A Frequency Surface for Rainfall Intensity and Duration
A technique for developing rainfall intensity-duration-frequency surface is presented. With the aid of the Box-Cox power transformation raw data is transformed into a jointly near normally...

 

 

 

 

Return to search