The MK II Art System?A New Generation of Automated Guideway Transit
Bombardier is well advanced in a program to produce a larger version of its successful Advanced Light Rapid Transit (ALRT) vehicle which is in service in Detroit, Scarborough (Toronto)...

Design and Construction of the Miami Metromover Extensions
Final design, right-of-way acquisition and construction of two extensions to the existing Downtown Miami Automated People Mover, known as the Metromover, began in September 1989. Millions...

Guideway Underbellies, Legs and Feet: Aesthetic Opportunities
Design aspects of APM elements that become permanent part of an urban or park setting are identified and examined. Numerous examples from operating systems and conceptual APM designs are...

Generic People-Mover Guideways, Pros and Cons
The Las Colinas Area Personal Transit (APT) system became operational in 1989, but the first section of guideway was built 11 years earlier, several years before the selection of the vehicle...

Scheduling Principles of the Miami Metromover Project
Large and complex construction projects with many interfaces among multiple prime contractors present extraordinary challenges to the owner and project manager. Project management techniques...

Success of Super-Turnkey Procurement of the Honolulu Rapid Transit System
The City and County of Honolulu, Hawaii has developed and, pending resolution of local funding, is procuring and building a 15.9-mile (25.6 km), 22-station, fully automated rapid transit...

Turnkey Contractor Procurement for System Improvements
This paper describes the development of a procurement method and documents issued to bidders for improvements to the Docklands Light Railway, London, England. The bidders were required...

The Advantages of E & M Systems Procurement
Fifteen years of experience, observations and lessons gained by two of the leading turnkey contractors in the transit and large people mover market have led to the following conclusion:...

Engineering Hydrology
This proceedings, Engineering Hydrology, contains papers that were presented at the Symposium held in San Francisco, California, July 25-30,...

High Speed Ground Transportation Systems I
Planning and Engineering
This proceedings,High Speed Ground Transportation Systems I: Planning and Engineering, consists of 74 papers presented at the ASCE's...

Infrastructure
Planning and Management
This proceedings, Infrastructure Planning and Management, consists of papers presented at two parallel conferences held in Denver, Colorado,...

Management of Irrigation and Drainage Systems
Integrated Perspectives
This proceedings, Management of Irrigation and Drainage Systems: Integrated Perspectives, consists of 156 papers presented at the 1993 ASCE...

Microcomputers in Transportation
Microcomputers continue to revolutionize the productivity and creativity of transportation professionals leading to improvements in transportation planning, design, and management processes....

Pacific Rim TransTech Conference
Volume I: Advanced Technologies
This proceedings, Pacific Rim TransTech Conference-Volume 1: Advanced Technologies, consists of papers presented at the conference held in...

Pacific Rim TransTech Conference?Volume II
International Ties, Management Systems, Propulsion Technology, Strategic Highway Research Program
This proceedings, Pacific Rim TransTech Conference Vo. II, consists of papers presented at an ASCE Conference held in Seattle, Washington,...

GIS and Storm-Water Management
Developing and implementing a municipal storm-water management program under the National Pollutant Discharge Elimination System (NPDES) presents a textbook example of how the abilities...

Hassle-Free Bridge Rehab
Engineers involved in Cleveland's Main Bridge rehab invoked whatever was necessary to keep area traffic moving and the bridge closure period to a minimum. They helped change...

Traversing the Terminals
When it opens this December, the Denver International airport will rely on an $89 million automated-people-mover, (APM) system as the primary means of transporting passengers between the...

Speedy Backfilling for Old Mines
In November 1992, the U.S. Bureau of Mines, in cooperation with the Office of Surface Mining (OSM), used two recently-developed pneumatic backfilling devices to completely fill an abandoned...

Finite Element Analysis of Reinforced Concrete in Japan and US: Introduction and Overview
The finite element method of analysis now provides the engineer with the capability to analyze very complex structural systems in a much more realistic manner including geometry and support...

 

 

 

 

Return to search