Pavement Treatment in Ohio Transportation System
This paper presents a modification of the original method in which the concept of fuzzy set theory is applied in the calculation of the PCR. Fuzzy numbers are introduced to represent those...

Integrating Computer Application for Pavement Management: A Case Study
This paper presents a case study of the process through which a relational database management system and stand-alone application programs are developed and integrated to form a comprehensive...

A Version and Configuration Scheme for Collaborative Engineering
This paper presents a data management model for collaborative design. Versions are proposed to support the independent evolution of design alternatives in an individual discipline. configurations...

Database Integration in Support of Construction Management
This presentation will describe how new object-oriented technology is being applied to this problem. The goal of this use of object-oriented systems is 1) to provide a method for processing...

A Computerized Methodology for Conducting Pedestrian Gap Studies
this paper will detail recent improvements with the procedure the New York City Department of Transportation utilizes when conducting Pedestrian Gap Studies. These improvements were made...

Facilitate Delay Claim Analysis with As-Built Schedule Databases
A computer-based As-Built Schedule Database can provide a useful tool for the investigation of project performance. The facts recorded in the database may be used to identify actual sequential...

The Use of SCADA for Real-time Calculation and Monitoring for CT Compliance at the Ralph D. Bollman Water Treatment Plant
The contra Costa Water District (CCWD) of Concord, CA was formed in 1935 under the authority of the State Water Code. CCWD purchases its water supply from the Central Valley Project (CVP),...

Contemporaneous Development of Field Data: Transportation Construction Claim Defense
This paper addresses the continuing development of a construction field database system documenting resources applied on the jobsite by Contractors. The paper focuses on the case study...

Computer Use in Claims Analysis -- Roundtable Discussion
Preparation or defense of construction claims is inherently time consuming and often counter-productive. This outline discusses some tools currently used in the construction industry to...

Practical Approach to Cope with Construction Cost Uncertainty in an Inflationary Environment
There are actions suggested to mitigate the risk in costs caused by an inflationary economy, such as escalation clauses and including price contingencies in the bid . This paper presents...

Management Information System Application on a Multi-Million Overseas Project
Project Management Information Systems (PMIS) provides improved data quality, consistency, timeliness, and reporting flexibility and improved project teamwork. Project managers have a...

A Knowledge-Based Computer System for Financial Wind Risk Management
This paper presents the results of a sponsored applied research project conducted by a multi-disciplinary team to integrate state-of-the-art methods in wind and collateral (e.g., surge,...

The Integrated Systems Approach to Facilities Management
This paper investigates the condition and use of the systems for facilities management and discusses process and considerations for improving the long term value of integrated facilities...

Displacement of Landmark Building Resulting from Adjacent Construction Activities
This paper describes the observations and presents comments related to the measurement of settlement and the avoidance of damage to a historic structure in the City of New York from adjacent...

Vibration Induced Settlement From Blast Densification and Pile Driving
This paper describes settlement and vibration environments produced by two construction activities, blast densification and pile driving. Blasting is of interest because of the significant...

Federal Risk Management Policy: Where Are the Problems?
Federal risk management policy involves both risk assessment and risk management elements. Risk assessment consists of hazard identification, dose-response assessment, exposure assessment,...

When and How Can You Specify a Probability Distribution When You Don't Know Much?
This paper presents an excerpt from the proceedings of the above-named workshop, and gives an overview of both the workshop and the proceedings. Five papers with diverse and complementary...

Methods for Risk and Reliability Analysis
Recently, there has been considerable emphasis on the state of decay in the nation's infrastructure because of its importance to society's needs and industrial growth. Water distribution...

Water Infrastructure Risk Ranking and Filtering Method
The availability of water distribution infrastructure is critical to the sustained support and growth of society. Water infrastructure consists of systems that carry water (pipe and irrigation...

A Theoretical Framework for Risk Assessment
This paper puts forth a theoretical framework for the development of any risk model. The focus is on the distinction between model and parameter uncertainty....

 

 

 

 

Return to search