The Public/Private Condo
A 20-story office building in Chicago was built on publicly owned land under a condominium arrangement that allowed a developer full ownership of air rights over and above the 100,000...
The Parking Problem
Corrosion of parking garage decks has become a multi-billion dollar problem, caused primarily by deicing salts that seep into the concrete and attack reinforcing steel. Design and construction...
Computer Cuts Tower Steel
Two computer programs developed by Lev Zetlin Assoc., New York City, revealed that some of the steel in what will be Philadelphia's tallest building, One Liberty Place, was...
Innovations in the Design of Electrical Transmission Structures
New concepts are being advanced for the design of electrical transmission structures. The papers in this book cover the following: weather-element loading conditions, structural options,...
Port Expansion of Eastport, Maine
A recent pier expansion now allows Eastport to provide 40 feet of water at low tide. The pier expansion consists of a concrete-decked steel pipe pile-supported extension to an existing...
Research on the Strength Characteristics of Timber Piling
Research on the strength characteristics of wet Southern Pine and Douglas Fir piling and poles is presented. Included are background information on wood's strength characteristics,...
Prestressed Concrete Piling?Design vs. As-Built
The proper design, manufacture, handling and installation of prestressed concrete piles is essential to their structural integrity and long life. A quality control program must be designed...
Innovative Repairs to Steel Sheet Pile Structures
Several unique and many unusual repair techniques have been used to structurally rebuild steel sheet pile walls. An example of a unique repair to a cellular cofferdam utilizing a suspended...
Rehabilitation of Wharf No. 8?Port of Houston
A routine inspection of wharves at the Turning Basin Terminal, uncovered evidence of extensive damage, including evidence that the 30-inch diameter steel pipe piles supporting Wharf No....
Geotechnical Considerations in the Design of the Wando Terminal Wharf Extension, Charleston, South Carolina
The South Carolina State Ports Authority (SPA) is currently examining construction concepts for the proposed 1,200-foot wharf extension and 40 acres of adjacent upland development at the...
Port of Kismayo (Somalia) Rehabilitation
Extensive deterioration of the 2070 ft long four-berth, marginal wharf at the Port of Kismayo necessitated a major rehabilitation to maintain operations. The selected scheme was a steel...
Building Motion in Wind
The trend towards higher structural efficiency and hence lower cost has resulted in a generation of lighter and more flexible buildings with a lower inherent capacity for energy dissipation...
The Mile High Dream
For the 1986 Tall Buildings Conference in Chicago, a group of experts studied the implications of a mile high skyscraper to be built of concrete. It is 500 ft square at the base, designed...
Use of In Situ Tests for Foundation Design on Clay
Years of evaluated experience with the field vane test in soft clays have resulted in empirical correction factors well suited for design practice. An extension of L. Bjerrum's...
Seismic Cone Penetration Test
A new test, called the seismic cone penetration test (SCPT) is described. A small rugged velocity seismometer has been incorporated into an electronic cone penetrometer. The combination...
Borehole Shear Test and Slope Stability
Three Iowa landslides analyzed on the basis of Borehole Shear Test (BST) data are reported. The soils included CL and ML loess and glacial till, and CH clay shale. Back-calculations from...
Pressuremeter Correlations for Preconsolidated Clay
Conventional triaxial compression and consolidation tests are often utilized to obtain parameters for design of foundations. More recently, Menard pressuremeter test results have been...
ECPT Investigation of a Slurry Trench Cutoff Wall
ECPT (electronic cone penetration testing) was used to investigate a soil-bentonite backfilled slurry trench cutoff wall at Calamus Dam in Nebraska, The wall was tested shortly after its...
In Situ Tests Aid Design of a Cylinder Pile Wall
In situ testing was used to verify geotechnical design parameters and modify construction for a 22 million dollar slope stabilization project near a major highway interchange. The project...
Correlation of Soil Parameters From In Situ and Laboratory Tests for Building 333
Pressuremeter, plate bearing and cone penetration tests were performed on the prepared foundation soil for Building 333 located in the Red River Army Depot near Texarkana, TX. The results...