Coolidge Dam Abutment Stability and Stabilization
This paper focuses on left abutment stability assessments and stabilization measures at Coolidge Dam, Arizona. Initial assessment of abutment stability was based on limited rock strength...

Conversion of a Concrete Slab and Buttress Dam to a Gravity Dam
The 58-foot high, 425-foot long, Ambursen-type, concrete slab and buttress, Gorge Plant Dam, which has a 120-foot long overflow spillway near the center, was converted to a concrete gravity...

Seismic Stability Modification Designs for Embankment Dams
The Bureau of Reclamation (Reclamation) has recently designed rehabilitations for four embankment dams to ensure their seismic stability. A fifth project is scheduled for construction....

Liquefaction Potential Leads to Dam Reconstruction
Results of a visual inspection of the Dundee Dam conducted in 1982 revealed the presence of seepage on the downstream toe of the left embankment. Subsequent subsurface explorations and...

Using Innovative Technologies and Geosynthetics in Embankment Dam Rehabilitations
The ever increasing development and confidence in new and innovative technologies such as geosynthetics, in conjunction with often significant economic advantages, have led designers to...

Stability of Embankments, Fills and Structures at the Bad Creek Project Under Static and Dynamic Loading
Duke Power was faced with the problem of using explosives to assist in removing a sensitive, saturated embankment cofferdam supported on a large rock plug. The first phase of the work...

Trial Lake Dam Reconstruction
Trial Lake Dam is located in the Uinta National Forest in Central Utah at an elevation of about 10,000 feet. The dam is 50 feet high and stores 1,700 acre-feet of water for downstream...

Dam Safety: A State's Perspective
The State's role in the rehabilitation of dams is discussed. The author presents a national picture of dam safety, describes some dam failure statistics on type of dams that have failed,...

Seismic Safety Modification of an Old Earthfill Dam
Chollas Dam was built as a water supply reservoir for the City of San Diego. The reservoir is no longer a part of the municipal water system but has been operated since 1966 as a recreational...

Hydration Properties of Shotcrete with an Accelerator Based on Calcium Aluminate
A new powder-type accelerator based on calcium aluminate has been used for shotcrete in underground construction. This accelerator can be applied to all types of shotcreting. The shotcrete...

Principles for a Rational Design of Shotcrete Linings in Hard Rock
The rock load on a shotcrete lining is hard to determine. This fact, however, does not prevent from designing the lining in a rational and consequent way. The paper treats the problem...

To the Limits of Shotcrete Linings
In the 1950s for the first time shotcrete was used because an essential support measure to guarantee the stability of an underground opening in Austria, Detzelhofer (1). Since that time...

Single-Shell Shotcrete Method
On a 60-m-long test stretch in the course of the construction of the Munich Subway the single-shell jointless shotcrete method was employed. In this case the standard cross section of...

Lattice Girders for Shotcrete Support
Lattice Girders complement the use of shotcrete for underground support by reducing the risk involved with using shotcrete alone for temporary or permanent lining of a tunnel or shaft....

Application of Shotcrete for Ground Support at Inco Mines
In 1989, shotcrete was first successfully introduced for ground support in production areas at Frood Mine. Until then the only successful application of shotcrete had been in major permanent...

Supply-Side Solutions
Although the crumbling bridge infrastructure has received much attention in the press and the engineering community over the past few years, the number of structurally deficient bridges...

Photogeologic Reconnaissance of X-Tunnel at Little Skull Mountain
An underground structure known as X-tunnel was investigated for the viability as an underground deep based missile system that included the capability to maintain survivability following...

A Note on Physical Modeling Approach for Assessment of Excavation Techniques
With the growing interest in utilizing underground space, the need for quantitative and qualitative assessment of excavation techniques to dictate the best choice for mining is now becoming...

Role of Fracture Zones in Controlling Hydraulic Head and Groundwater Flow?Experience from Site Characterization Program in Finland
The preliminary site investigations for the final disposal of HLW produced by TVO have been carried out during 1987 - 1992 in five areas. All the areas consist of Precambrian crystalline...

Prioritization of ESF Testing and Integration with Design and Construction
The developmental strategy for underground site characterization testing in the Exploratory Studies Facility (ESF) of the Yucca Mountain Site Characterization Program is outlined. The...

 

 

 

 