A River Runs through It
The new stadium under construction for the New England Patriots is architecturally and structurally unique, but it is also attracting attention for another reason: the restoration of a...

Supercharged
The Groundwater Replenishment (GWR) System is a regional water supply project sponsored jointly by the Orange County Water District (OCWD) and the Orange County Sanitation District (OCSD)....

Model Water Sharing Agreements for the Twenty-First Century
Sponsored by the Task Committee for the Shared Use of Transboundary Water Resources of the Environmental and Water Resources Institute and the Laws and Institutions Committee of ASCE....

The Nisqually, Washington, Earthquake of February 28, 2001
Lifeline Performance
Prepared by the Technical Council on Lifeline Earthquake Engineering of ASCE. This TCLEE Monograph details the effects of the Nisqually, Washington,...

Riparian Water Regulations
Guidelines for Withdrawal Limitations and Permit Trading
Sponsored by the Environmental and Water Resources Institute of ASCE. This report explains how to regulate the routine withdrawal of water efficiently...

Tunneling into the Future
The Chattahoochee Tunnel will increase the wastewater transport capacity of a suburban Atlanta county while greatly reducing the possibility of sanitary sewer overflows into the Chattahoochee...

Environmental Fluid Mechanics
Theories and Applications
Sponsored by the Fluids Committee of the Engineering Mechanics Division of ASCE. This report provides environmental engineers with a comprehensive...

Control of Microorganisms in Drinking Water
Prepared by the Water Supply Engineering Technical Committee of the Infrastructure Council of the Environmental and Water Resources Institute of ASCE. ...

Rising Tide
In an effort to accommodate a new light-rail system in New Jersey between Camden and Trenton, the state's Department of Transportation began the formidable task of enhancing...

Storm-Water Strategy
Water pollution laws are certainly nothing new, but increased public scrutiny, beach closures, and media coverage�particularly in Orange County, California�have placed new pressures on...

A Dam for a Dam
The General Electric (GE) Dam in Minneapolis, Minnesota, was more than a century old when it began leaking excessively in December 1998. Operations staff for the dam owner�the Minneapolis-based...

Water for Ahwatukee
Scheduled for completion in August, the South Mountain Water Facilities pipeline will increase drinking water capacity to the community of Ahwatukee Foothills, a rapidly growing south...

The Submarine Mission
A new Navy engineering and support facility for submarines has been designed and constructed at Lake Pend Oreille, near Bayview, Idaho. The project includes a bridge approach to the facility,...

Deep Freeze
In engineering, overcoming a failure can sometimes be more instructive than completing a project with unqualified success. Such was the case with the collapse and repair of a force main...

Comparison of Hydrodynamic Parameters for a Floating Breakwater
The U. S. Army Engineer Research and Development Center is in the process of developing a Rapidly Installed Breakwater System (RIBS) for use in Joint Logistics Over the Shore Operations...

Montioring and Modeling of Tandem Breakwater System at Hammond, IN
A tandem breakwater system was constructed in 1989-90 to provide protection for a large marina at Hammond, IN, at the south end of Lake Michigan. A five year monitoring program (1993-98),...

St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...

Testing a Multi-Tiered Stress-Gradient Model for Risk Assessment Using Sediment Constituents from Coral Reef Environments
Coral reefs are threatened worldwide by stresses ranging from local to global in extent. Local stresses range from boat/ship groundings and sewage outfalls to dredging and coastal clearing....

Clean Water at the Crossroads
Thirty years after the passage of the Clean Water Act, the quality of effluent from the nation's wastewater treatment plants has improved considerably. However, much of the...

Rapid Delivery
Facing nearly dry wells and a moratorium on development that was about to expire, a small town in the pacific Northwest, using the design/build delivery method, was able to quickly design...

 

 

 

 

Return to search