Terminal Asphalt Patching: An Innovative Approach
Asphaltic concrete has dominated the terminal industry as the pavement of choice for years. It is readily available and economical to install but requires considerable maintenance expense....

Underground Research: Here and There
Geotechnical research in Europe, Japan and the U.S. were compared in a study funded by the National Science Foundation. Visits to research facilities and several surveys resulted in two...

Water Conservation at the Antarctic Wasa Base - Results 1989-90
The Swedish WASA base was erected in the Norwegian sector of Antarctica during the 1988-89 summer season. The base was on a nunatakk and consisted of a dwelling house with full living...

Spray and Ice Measurement Instrumentation for Ships
Bow slamming is the primary water delivery mechanism for ship superstructure icing. Spray flux is largely dependent upon hull dynamics, and cannot be computed numerically with current...

Precipitator Retrofit and Repair: A Case Study
Described is a difficult fossil power station retrofit project performed on a tight schedule at a congested site. Installation of a new supplementary precipitator and structural repairs...

Retrofitting Existing Fossil Plant Facilities
This paper summarizes the contents of and provides some insight into the usefulness a structural engineer will get from the publication 'Retrofitting Existing Fossil Plant...

Automation of Union Electric's Hydro-Power Plants
Union Electric Company is spending twelve million dollars on Electronic Control and Monitoring equipment at two of their hydro-electric plants (a total of twenty-seven generating units)...

Innovative Aspects of the DQE/GPU Project
The DQE-GPU joint project is an endeavor at supplying electricity to its customers in an economically competative way. The project cosists of using existing power stations in the Three...

The Development Process for Unique Underground Equipment for Waste Handling
The Department of Energy (DOE) is currently planning to site, construct, and operate a geologic repository at Yucca Mountain, Nevada, for the disposal of high-level nuclear waste (HLW)....

Commissioning of High Level Liquid Waste Facilities
A programme of commissioning tests was carried out on the latest High Level Liquid Waste Evaporation and Storage Facilities constructed at BNF plc Sellafield, England. These tests set...

Mechanical Excavator Performance in Yucca Mountain Tuffs
A research effort of four phases is in progress at the Colorado School of Mines. The overall program will evaluate the cutability of welded tuff and other lithologies likely to be excavated...

Recent Development in the Design of Hard Rock Tunnel Boring Machines for the Mining Industry
Underground development for nuclear waste storage will possibly require tunnels to be excavated in a variety of rock conditions and configurations. Recent innovations in Tunnel Boring...

Shaft Boring Machine?A Method of Mechanized Vertical Shaft Excavation
The Shaft Boring Machine (SBM) is a vertical application of proven rock boring technology. The machine applies a rotating cutter wheel with disk cutters for shaft excavation. The wheel...

Mechanical Tunnel Excavation in Welded Tuff
The Technical Review Board for the United States high-level radioactive waste facility at Yucca Mountain has recommended maximum use of 'the most modern mechanical excavation...

A First Look at Roadheader Construction and Estimating Techniques for Site Characterization at Yucca Mountain, Nevada
The Yucca Mountain site characterization program will be based on mechanical excavation techniques for the mined repository construction and development. Tunnel Boring Machines (TBM's),...

Design, Selection, and Application of Disc Cutters in Hard and Abrasive Rock
Disc cutters have been used on tunnel boring and shaft boring machines for many years and are a proven method to bore hard rock. This paper will study the important parameters which effect...

A Substructuring Algorithm for Analysis and Optimization of Large Structures on Parallel Machines
An efficient substructuring algorithm is presented for analysis and optimization of frame structures on parallel machines. The underlying concept is to pre-process the input data in such...

Computer Applications in the UCB Geotechnical Laboratories
The use of personal computers has become an indivisible part of the University of California at Berkeley (UCB) geotechnical testing laboratories. The University has been on the forefront...

Ocean Mining with Shoreline Protection
This paper describes an existing construction system that permits building large concrete structures directly on the water in low-cost floating formwork with unskilled local labor operating...

Reactivation of the Oil and Hazardous Materials Simulated Environmental Test Tank (OHMSETT) Facility
The Oil and Hazardous Materials Simulated Environmental Test Tank (OHMSETT) was run by the Environmental Protection Agency (EPA) from 1974 to 1988. This open-air tank was used to test...

 

 

 

 

Return to search