Procurement Quality Engineering
The 'Procurement Quality Function' is an element of the Body of Knowledge of Quality Engineering, as defined by the American Society for Quality Control (ASQC). This paper describes the...
The Use of Technical Specialists in Quality Assurance Audits
This paper provides a nontechnical discussion of the use of Technical Specialists in quality assurance audits by the Office of Civilian Radioactive Waste Management's Office of Quality...
Throughput Rate Study
The Civilian Radioactive Waste Management System (CRWMS) Management and Operating (M&O) Contractor, has completed a study to analyze system wide impacts of operating the CRWMS...
ATW System Impact on High-Level Waste
Criteria are developed for transmutation system impact on HLW storage that are related to intrusion and long-term risk reduction. Thermal reactor, fast reactor, and accelerator-driven,...
The Waste Isolation Pilot Plant (WIPP) Integrated Project Management System
The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission...
Recent Management Experience of UK Performance Assessments of Radioactive Waste Disposal
The approach to management used over the past decade by a UK Government regulatory body (HMIP) to develop, test and apply integrated risk assessment methods, using a team of private contractors,...
Remote Spent Fuel Handling in France at the La Hague Cask Unloading Facility
French policy for the back end of fuel cycle is based on spent fuel reprocessing. Irradiated spent fuels are transferred in casks from the nuclear reactors to the reprocessing plant where...
Conceptual Design of a Monitored Retrievable Storage Facility
In order to achieve timely acceptance of spent nuclear fuel into the federal radioactive waste management system and to limit the amount of additional at-reactor storage capacity that...
Reliability Modeling of an Engineered Barrier System
The Weibull distribution is widely used in reliability literature as a distribution of time to failure, as it allows for both increasing failure rate (IFR) and decreasing failure rate...
A Systematic Human Factors Assessment of a Department of Energy Facility
This paper presents the methodology for conducting a systematic human factors assessment of the as-built configuration of buildings at the Rocky Flats Plant (RFP). In support of this effort,...
The Best of Both Worlds: Integrating Statistical and Deterministic Approaches to Area Remediation
We seek a complete framework for adaptive area characterization for purposes of remediation, incorporating both statistical and deterministic features. This hybrid methodology involves...
Mangling the Models: Real-Life Experiences in Voluntary Siting
Social scientists are accumulating a growing body of research to guide the development of communications models for siting controversial facilities. The models developed by our social...
Functional Analysis of the Exploratory Studies Facility
This paper discusses the development of the 'Physical System Requirements-Exploratory Studies Facility' (PSR-ESF) document. Based on a functional analysis approach, this document includes...
Potential Nuclear Material Safeguards Applied to the Department of Energy's Civilian Radioactive Waste Management System
The Office of Civilian Radioactive Waste Management (OCRWM) within the U.S. Department of Energy is charged with the responsibility of safe and efficient disposal of this Nation's civilian...
Safety Envelope Input: Nuclear Facility Isotopic Content (NFIC) Management System
The Westinghouse Savannah River Company (WSRC) is aggressively applying environmental remediation and radioactive waste management activities at the U. S. Department of Energy's (DOE)...
Cost and Schedule Baseline Management in the OCRWM Program
The Department of Energy's Office of Civilian Radioactive Waste Management has established a baseline change control system to support their program control system. The program control...
Fear of Permanence: The Challenge of Siting Interim Facilities
This paper examines an increasingly urgent and surprisingly difficult task: siting potentially hazardous facilities that are intended to operate for a limited period, such as a Monitored...
Application of the Global Positioning System to Locating Remote Sites
The location of Near Field (NF) sampling stations, used for the radiological monitoring program portion of the site characterization phase of the Yucca Mountain Project, were determined...
Project Control?The Next Generation
The Yucca Mountain Site Characterization Project (YMP) is the U.S. Department of Energy's (DOE) second largest Major System Acquisition Project. We have developed an integrated planning...
A Computer Model for Multiplant Hydroelectric System Simulation
An interactive computer model of a multi-plant hydrothermal electric power generating system has been developed that roughly captures the main features of the British Columbia Hydro system....