Top Projects for 1989
Transportation-related projects, most notably bridges, dominate the 1989 OCEA projects, but each of the 11 improved the quality of life of people in the community without harming the environment....

Scour Assessment at Bridges
Due to the key role that bridges play in the national transportation system, the Federal Highway Administration has developed a scour evaluation program. This program, issued in the form...

Local Scour at Bridge Abutments
Comparison of local scour depths at bridge abutments computed using different equations yields a large variation in predicted values. To consolidate the fragmented results of previous...

Hydraulic Mechanisms of Riverbank Erosion
Recent efforts are described to develop an improved understanding of bank failure due to piping in noncohesive layers in riverbanks. The efforts included field surveys and laboratory tests....

Geotechnical Aspects of River Bank Erosion
The principal geotechnical mechanisms of river bank failure are identified on the basis of extensive field investigations on many different river systems. The role of each factor depends...

Incremental Damage Assessment (IDA) For Lake Darling Dam
An Incremental Damage Assessment (IDA) has been completed for Lake Darling Dam, located on the Souris River, near Minot, North Dakota [1]. The IDA has indicated that a reduction in flood...

Peak Outflow From a Breached Embankment Dam
A relation for rapidly predicting the peak outflow rate from a breached embankment dam has been presented. The prediction equation is based on reliable data from 19 embankment dam failures...

State-of-the-Art Report: Mexico
Design recommendations for groins and spur dikes are presented. For groins the most important ones are: to build them with sloping crests, orientated downstream and maximum spacing of...

Risk-Cost Principles for Dam Safety Analysis
The purpose of this paper is to present the principles and issues of risk-cost analysis as they have evolved in the evaluation of dam safety improvements. The paper also reviews some results...

Impact of Risk-Based Analysis on Hydrologic Design Practices
This paper provides a brief review of the current hydrologic design practices of the U.S. Army Corps of Engineers (USACOE) for safety inspection of dams and the current hydrologic design...

Water Distribution System Design Considering Component Failure During Static Conditions
A continuous hydraulic availability relationship is presented which more realistically models minimum pressure requirements for water distribution systems. This relationship is used in...

Hydraulic Analysis of the Schoharie Creek Bridge
Ten people died on April 5, 1987 as a result of the collapse of two spans of a New York State Thruway bridge into the floodwaters of Schoharie Creek. The cause of the bridge failure was...

Risk Assessment of System of Dams
The application of risk assessment to a series of dams on a river is presented here. A general discussion of the basic principles of risk assessment approach to dam engineering is given...

The Tides Effects on the Dam Break Flood Wave
The accuracy of water level predictions downstream of the dam is dependent upon the breach evaluation, the correct estimation of the roughness coefficients and when the flood wave reaches...

Rule Curve Operation at Terzaghi Dam to Pass the Probable Maximum Flood
Terzaghi dam is located on the Bridge River, a tributary of the Fraser River. The spillway was originally designed for the 1000-year flood. Probable Maximum Flood (PMF) studies completed...

Some Pertinent Considerations in Dam and Reservoir Design
Two important considerations in designing and constructing a multipurpose earthdam and reservoir are to minimize losses in the event of dam failure because of overtopping, and to conserve...

Update: Ozark-Webbers Falls Turbines
The Ozark and Webbers Falls powerhouses were designed and constructed under the supervision of the U.S. Army Corps of Engineers. Both are located on the McClellan-Kerr Arkansas River Navigation...

Analyses of the Lower San Fernando Dam Failure
The main methods employed for the back analysis of the behaviour of the Lower San Fernando Dam during the 1971 earthquake are described. The requirements for a comprehensive analysis are...

Beautiful Bridges
There are no rules for creating beautiful bridges. While talent and experience count, bridge design is quite complex and collaboration between highway engineers, architects, and landscape...

From Guesswork to Guarantee?
Maser describes a project to determine the effectiveness of radar and infrared thermography in detecting deterioration of asphalt overlaid bridge decks. The project, sponsored by the New...

 

 

 

 

Return to search