Continued Development of the Columbia Basin Project?A Status Report
The Columbia Basin Project is located in central Washington State and encompasses approximately 1 million irrigable acres. Water from the project delivery system was first applied in 1952...
The Water Erosion Prediction Project: Model Overview
A new generation of water erosion prediction technology is being developed by the USDA Water Erosion Prediction Project (WEPP). The WEPP models are a new erosion prediction technology...
Computerized Resource Planning for the Central Valley Project, California
The Central Valley Project (CVP) consists of nine reservoirs and ten powerplants owned and operated by the United States Government. On an average water year basis, the CVP, with a maximum...
Stochastic Evaluation of Reservoir Operation Rules
The major water facilities in California encompass the State Water Project, operated by the State of California, and the Central Valley Project, owned and operated by the United States...
Probabilistic Dependable Hydro Capacity: Benefits of Synthetic Hydrology
This paper focuses on the benefits of using synthetic streamflows (the 'synthetic hydrology' approach) for determining a probabilistically defined dependable...
Optimal Operational Analysis of the Colorado-Big Thompson Project
The Northern Colorado Water Conservancy District is currently investigating the feasibility of constructing a major water storage project on the mainstem of the Poudre River for water...
Simulation Model for Economic Irrigation Project Planning and Design
The principle design parameters considered are: water supply configurations (quantity, source and storage); shapes and sizes of the area to be served; on-farm irrigation techniques; cropping...
The Los Vaqueros Model: A Microcomputer-Based Reservoir Planning System
This paper describes the development and application of a set of microcomputer models for the evaluation of a complex water resources project. The Los Vaqueros Model includes components...
100 Years of Sedimentation Study by the USGS
On January 15, 1889, the U.S. Geological Survey began collecting sediment data on the Rio Grande at Embudo, New Mexico. During the past 100 years the U.S. Geological Survey's...
History of the Federal Interagency Sedimentation Project
Since 1939, the date of the Project's inception, the team has operated under the direction of two lead agencies - the U.S. Geological Survey and U.S. Army Corps of Engineers....
Lessons from Ten Years Experience in 2D Sediment Modeling
The purpose of this paper is to share some of the lessons learned from the experience of the Hydraulics Lab Estuaries Division (WESHE) in applying two-dimensional (2D) numerical models...
Relationship Between Channel Migration and Radius of Curvature on the Red River
The system behavior of meanders was investigated on the Red River between Shreveport, LA, and Index, AR. The effects of plan form geometry (r/w) and erodibility of bank material on the...
River Training Works in Gezhouba Project on the Yangtze
A great number of research results of the river regime planning and river training work in Gezhouba Project on the Yangtze are described together with their application in the Project....
Compendium of International Ocean Energy Activities
This
Tapping A Glacier
The Eklutna water project receives a 1988 Outstanding Civil Engineering Award of merit. The project�a 30 mile pipeline and treatment plant that brings glacial runoff from Eklutna lake...
Top Projects for 1989
Transportation-related projects, most notably bridges, dominate the 1989 OCEA projects, but each of the 11 improved the quality of life of people in the community without harming the environment....
Baseflow and Beta Distribution
For water resources projects, design engineers are often required to separate total flow into baseflow and direct runoff. During such studies, baseflow is considered a crucial parameter;...
The Drought of 1988 in the U.S. Army Engineer District, Pittsburgh
The summer of 1988 was the hottest of the century in the Pittsburgh District. Pittsburgh experienced 38 days of 90 F degrees or more, including 3 days above the 100 F degree mark. This...
Partnership in Environmental Design for Brush Creek Flood Control
Brush Creek drains a highly urbanized area in metropolitan Kansas City. A large physical model was used to develop a channel modification design for flood control. The Parks and Recreation...
Hydraulic Transient Analysis of High-Head Hydropower Project
An iterative computer simulation procedure called LIQT (Liquid Transient), which performs simulations of hydraulic transients in closed conduit hydro-power systems, is used to estimate...