Stability and Loads
This chapter examines stability and loads. Topics include stability and lateral load resistance during construction; effective lengths of cantilever columns; effect on stability of frame...

Initial Considerations
The purpose of this section is to aid the line designers in developing their specifications for fiber-reinforced polymer (FRP) materials utilized in electric overhead line structures....

Suggested Guidelines for Performance-Based Tests
Although several standard tests are cited in this chapter, these tests are not designed specifically for fiber-reinforced polymer (FRP) overhead line structures. There are, in fact, no...

Up into the Sky
What is the future of the skyscraper? The events of September 11 have sparked numerous questions regarding the history and future of tall buildings in America, and before the World Trade...

MAX Transit
Two expansions to the Metropolitan Area Express (MAX) light-rail transit system in Portland, Oregon, illustrate the value of exemplary planning and creative financing. The Airport MAX...

Me, Myself and Infrastructure
Private Lives and Public Works in America
Companion guide to the ASCE 150th Anniversary museum exhibit. This book is a consumer's-eye view of infrastructure?the technological networks...

Structure as Art
The structural engineering to support the architecture of a free-form, Frank Gehry-designed building is never easy, but the engineers for a new university building devised several innovative...

Evaluation of the Tricon Retained Soil Wall System
Prepared by the Highway Innovative Technology Evaluation Center, a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed to...

Recent Advances in Optimal Structural Design
Sponsored by the Technical Committee on Structural Design of the Technical Administrative Committee on Analysis and Computation of the Technical Activities Division of the Structural Engineering...

Evaluation of the Maccaferri Terramesh System Retaining Wall
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed...

Rising Tide
In an effort to accommodate a new light-rail system in New Jersey between Camden and Trenton, the state's Department of Transportation began the formidable task of enhancing...

Twin Crossings
The Hungerford Bridge actually comprises twin pedestrian bridges that are being constructed on either side of an operational 19th century railway bridge over the River Thames in London....

Countering Chemical and Biological Terrorism
Prior to the terrorist attacks of September 11, building protection related to terrorism primarily focused on the threat of bombs detonated inside vechicles. However the September 2001...

Berm Breakwaters?Design, Construction and Monitoring
The philosophy of the fieldwork of Berm breakwaters was applied in Iceland. A few case histories were described with emphasis on quarry investigations, design, construction and monitoring....

Repeat Performance
Working with a budget of $10 million, engineers designing a new high-rise residential structure in New York City had to find creative ways to control costs. One budget-saving idea was...

The Inside Story
A full-scale renovation of the interior of Oklahoma City's Civic Center Music Hall required shaving much of the depth from two trusses under load conditions, installing new...

Changing Channels
When the strict design parameters of a correctional facility in remote Pennsylvania meant blocking a headwater stream, a team of environmental engineers rerouted the waterway 400 ft (122...

Carolina Crossing
The designers of a cable-stayed bridge across the Cooper River in South Carolina incorporated stringent seismic criteria to safeguard against potentially devasting earthquakes....

Corinthian Crossing
The mainland Greece will soon be linked to the Peloponese by one of the longest cable-stayed bridges in the world, the Rion-Antiron Bridge, which also happens to feature soil-enhancing...

Rapid Delivery
Facing nearly dry wells and a moratorium on development that was about to expire, a small town in the pacific Northwest, using the design/build delivery method, was able to quickly design...

 

 

 

 

Return to search