Inside the Manhole: New Design on a Leaky Link
Wastewater collection systems represent a major investment for every community, not only in capital dollars, but also in the well-being of community members. Though sanitary sewer manholes...
Environmentally Sustainable Development: A Concept in Action
Environmentally sustainable development denotes a balanced approach with appropriate consideration for environmental protection. The successes achieved in the development of five diverse...
Composting, Past, Present and Future
Over the past ten years, the composting process has taken on a different look as a method of processing municipal sludge. Today it is one of the most popular and prevalent methods of sludge...
Anoxic-Aerobic Activated Sludge Treatment
An activated sludge system was operated at a relatively low SRT of 1-2 days at the City of Phoenix to meet secondary treatment requirements. Operating MLSS concentrations were 400-600...
Constructed Wetlands at Mesquite, Nevada
Subsurface flow (SF) wetlands are used to provide effluent polishing following treatment in an aerated lagoon at Mesquite, Nevada. General SF wetland design methodology is discussed in...
Influence of Moisture Influx on the Hygro-thermal Performance of a Clay Buffer Developed for Nuclear Disposal Vault
This paper focusses on an experimental study that investigates the heat transfer and moisture movement within a bentonite clay buffer compacted in a borehole located in a granite block....
Project Peer Review Guidelines
Breaking Down the Barriers
The structural engineering of multistory buildings is a complex and time-consuming chore, but new design and analysis tools can greatly simplify the task. The article traces the development...
LRFD: Still Waiting
Introduced in 1986, load and resistance factor design (LRFD), has a way to go before it becomes standard practice for steel design. LRFD-based design typically results in savings on gravity...
Portland's New Approach to Maintenance
The traditional if it ain't broke don't fix it approach to maintenance was not working for Portland, Oregon's two wastewater treatment plants. By...
Using Project Management Techniques in Hydro-Relicensing
To answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company (CMP) has applied the principles of project management,...
A Hydroelectric Plant Operator's Assistant
This paper describes a PC based application designed to assist in the process of enhancing the performance of multi-unit hydroprojects. Optimization considerations, uses of the Operator's...
Double Radial Gates for the Brunau Ice-Retention Weir in Switzerland
During the springtime thaw, the River Sihl, which flows from the south into the city of Zurich, Switzerland, carries large quantities of ice flow. In 1968, to protect the footings of a...
New Demands for Hydro Unit Inspection and Preventive Maintenance
As the hydro industry enters the 90's, special interest has been drawn to the fundamental practice of hydro unit inspection and maintenance. New demands on hydropower equipment...
Operations and Maintenance Manual for Bradley Lake Hydroelectric Project
Bradley Lake Hydroelectric Project is located on the Kenai Peninsula of Alaska. The project consists of two 63 MVA turbine-generators fed via a single 3.5-mile-long penstock. The water...
Total Quality Planning
When it comes to major unit maintenance, 'total quality results' require an investment in 'total quality planning.' The successful replacement...
Probabilistic Scheduling of Cavitation Repairs
The probabilistic nature of maintenance scheduling is exemplified by operating histories and conditions which vary from unit to unit. Typically, an operator must decide whether to repair...
R. H. Saunders GS?Propeller Turbine Runner Replacement Project Outline and Model Development
Ontario Hydro's operating philosophy is to operate all of its facilities in an optimum manner. The basic rationale for upgrading this plant is to maximize its energy potential...
Dillon Hydroelectric Project Performance Versus Expectations
The Dillon Hydroelectric Project was commissioned in 1987. Design and construction are briefly described; plant availability is compared with design expectations; and maintenance costs...
On-Site Rehabilitation Capabilities for the Nineties
This paper will review recent technological advancements in on-site manufacturing and machining capabilities which have been developed for the proper installation of new hydro turbines....
Return to search