Landfill on Screen
Engineers for a $3.7 million regional landfill in Iowa turned to computer-aided design at every project step from conceptual design through operations monitoring following construction....

Colorado Dome
Innovative engineering and precise design helped engineers overcome a building's unique shape and difficult site to deliver the $71.5 million Jefferson County Government Center...

Vertical Erosion on Beaches and the National Flood Insurance Program
During the 25 years that the National Flood Insurance Program (NFIP) has been in existence, there has been an increasing recognition of the contribution of both episodic and long-term...

Marina Facilities Planning Design and Operations in Hurricane Prone Areas
The overall growth in population of coastal areas in the southeastern and coastal regions of the Unites States has created a need for additional water related recreation facilities such...

Holding a Shorelind with a Buried Revetment
Two shoreline modification projects were designed that use a new application of an old idea to provide erosion protection and improve shoreline access and aesthetics. The innovation consists...

Breakwater Design in the Chesapeake Bay: Dealing with the End Effects
This paper documents various methods for treating the terminal ends of headland breakwater systems. Twelve sites in Chesapeake Bay were selected for study. In selecting design alternatives,...

St. Paul Harbor, St. Paul Island, Alaska
The City of St. Paul requested the Alaska District of the Corps of Engineers to become involved in their harbor project through Section 204e of Public Law 99-662. This arrangement allowed...

Wave Climate Studies Along the Turkish Coast of the Black Sea
Wind-generated waves produce the most powerful forces to which coastal structures are subjected. Therefore, wave information is required for the proper planning and reliable design of...

The Management of Coastal Lagoons: The Approach of the Venice Safeguard Project
An overall design for the safeguarding of Venice from hydraulic risks and the re-establishment of the enviromental equilibrium of its Lagoon has been completed in 1992. The large number...

The Planning and Design of Multipurpose Artificial Barrier Reefs
Multipurpose artificial barrier reef is proposed for the enhancement of fisheries as part of the purpose of entire system of structures in Japan. As part of our planning efforts we are...

Travel Time Data Fusion in Advance
The ADVANCE project in the Chicago metropolitan area is one of several ATIS operational tests currently underway in the USA and abroad. Fusion of equipped vehicle (probes) travel time...

Distribution of Flood Volumes Beyond Design Discharges
Quantitative prediction of flood volumes beyond design discharges is important for hydrologic design of river constructions, such as bridges and culverts, because these are the volumes...

Design Hydrographs in Coastal Wetland Watersheds
The use of synthetic unit-hydrographs for hydraulic design in ungaged watersheds has been an accepted practice for over 50 years. In southeastern U.S. coastal regions, which contain extremely...

Lag Relations for Semi-Arid Regions and Urban Areas
The use of synthetic unit hydrographs often requires the estimation of lag or other travel time parameters. Several procedures are available for estimating such unit hydrograph parameters....

Lessons from Hurricane Andrew's Effects on Hydraulic Structures
Documentation and description of Andrew's effects on open channels and other hydraulic structures in South Dade County, Florida, are presented, based on observations made during field...

A Computer System to Operate Coastal Structures
The Central and Southern Florida Flood Control Project (C&SF) was designed and built by the U.S. Army Corps of Engineers and is operated and maintained by the South Florida Water...

PMF Estimation for a Sparsely Gaged Watershed
This paper describes a procedure used to determine the design-basis and probable maximum flood (DBF and PMF) for Jiguey Dam located in the Dominican Republic. This dam is situated upstream...

Monongahela River Mapping & Flood Hazard Study
The study described here represents a unique collaboration and cost-sharing effort between two Federal agencies: the U.S. Army Corps of Engineers (USACE) and the Federal Emergency Management...

A Probabilistic Approach to Estimate Design Parameters for Flood Control Projects
The purpose of this paper is to provide engineering consultants with an improved method to estimate design parameters for various return periods in rural areas. The proposed method combines...

Additional Years of Record and Peak Discharge
The effect of additional years of stream gaging records is analyzed for stream gages in Nebraska. Frequency estimates are based on procedures outlined in Bulletin 17B, including skew coefficient...

 

 

 

 