Report on Ship Channel Design
Strength Design for Reinforced-Concrete Hydraulic Structures
21st Century Timber Engineering
Timber engineering is moving into the 21st Century faced with challenges in technology, governmental mandates and environmental concerns. Engineers are continuously being challenged in...
Finite Element Analysis of Reinforced Concrete Structures II
This proceedings,
Guidelines for PC-Based Data Acquisition Systems for Hydraulic Engineering
Reliability and Uncertainty Analyses in Hydraulic Design
Prepared by the Subcommittee on Uncertainty and Reliability Analyses in Design of Hydraulic Structures of the Technical Committee on Probabilistic Approaches to Hydraulics of ASCE. ...
Dynamic Response and Progressive Failure of Special Structures
This proceedings,
Managing Work
Managers often ask engineers to do more work without providing more resources to support the requests. In response, engineers typically counter that they need more resources (time, money,...
Stability of Rock Armour Under Random Wave Attack: Performance of Non-Standard Rock Shapes and Gradings
Quarried rock is frequently used to protect coastal and shoreline structures against wave attack. Armour rock specifications generally exclude rock that is rounded or tabular, and gradings...
RCC for Rehabilitation of Dams in the USA-An Overview
The use of roller-compacted concrete (RCC) has rapidly become a powerful new tool in the USA for engineers involved with the rehabilitation of existing dams. Starting in 1980, RCC has...
Design and Proposed Construction Techniques for Pangue Dam
The paper describes the site conditions, design and proposed construction methods for the 115 m high Pangue Dam, Chile's first RCC dam. Trial mix design work and test embankments...
Thermal Analysis for RCC?A Practical Approach
Roller compacted concrete (RCC) structures, by nature of the construction method, tend to be monolithic structures or structures with minimal contraction jointing. Recurring questions...
Hydraulics of Stepped Spillways for RCC Dams and Dam Rehabilitations
Stepped spillways are natural extensions of roller-compacted concrete (RCC) placement techniques. Stepped spillways were first used with concrete dams, and designers are eager to use the...
Design of the Boney Falls RCC Emergency Spillway
The Boney Falls Emergency Spillway was designed as a mass roller compacted concrete structure. Alternative designs considered include a fuse plug, lowering the embankment and paving with...
Tomorrow's Schools
While what's wrong with education looms as a national concern, many communities are doing something positive about it. They're constructing new schools designed...
Designing Reinforced Rock
The reinforced rock arch design method has been used to stabilize coal mine excavations for 40 years, but so far has been applied to only a few tunnels. The use of rock reinforcement develops...
Coastal Geomorphology and Sand Budgets Applied to Beach Nourishment
It is commonly assumed beach nourishment projects are more successful if applied over long distances of shoreline. Short projects tend to unravel at the ends as the bulge formed by the...
Beach Nourishment with Aragonite and Tuned Structures
The first full-scale use in the United States of imported aragonite sand for beach restoration was undertaken at Fisher Island, Florida, between December 1990 and April 1991. About 20,000...
Monitoring of the 1988 Boca Raton Beach Nourishment Project
During July and August of 1988, approximately 843,000 cm of sand was placed along a 2.3-km stretch of beach in Boca Raton, Florida. Post-cosntruction monitoring of the beach nourishment...
Mitigation of Harbor Caused Shore Erosion with Beach Nourishment Delayed Mitigation, St. Joseph Harbor, MI
St. Joseph Harbor MI. was the first Corps of Engineers Section 111 erosion-mitigation project to be built. Between 1 Jun 76 and 5 Aug 85, about 1,067,000 cy of fine sand was placed in...
Return to search