The Great Canadian Bridge Slide
An aging multispan swing bridge had to be replaced in Trenton, Ont., with minimal interference to both river and road traffic, and without changing its alignment. The solution was to build...

Probing the Golden Gate
The Golden Gate Bridge has just come through the most detailed analysis ever attempted in its 53-year-old history. This analysis was squeezed into a desktop computer that calculates twice...

Pump Station/Storage Opportunities for Urban Freeway Systems
This paper introduces the concept of utilizing underground storage to minimize both the initial cost and the long-term maintenance and operation costs of multiple pump stations for a freeway...

Optimizing Regional Detention Basins for Price Expressway
Stormwater runoff from the drainage area contributing to the Price-Santan Freeway is captured in regional detention basins which require a series of pump stations for evacuation. With...

New Lessons About the Hydraulic Performance of Highway Storm Sewer Inlets
Laboratory experiments were performed with highway storm water curb inlets to 1) reduce the oblique standing wave that extends into the highway from the downstream side of the inlet and...

Hatchie River and Schoharie Creek Bridge Failures
Within a 2-year period two large bridges collapsed into flooded rivers resulting in a total of 18 people plunging to their deaths. Both bridges had been inspected by probing, but had not...

Bridge Scour Vulnerability Assessment
Although the failure of the New York Throughway bridge over Schoharie Creek in 1987 has focused national attention on scour related failures, other failures reinforce the need for implementing...

Bridge Inspections Related to Bridge Scour
The failure of the Silver Bridge over the Ohio River in Point Pleasant, West Virginia, on December 15, 1967 resulted in the establishment of the National Bridge Inspection Standards (NBIS)...

A National Bridge Scour Data Collection Program
A study to collect and analyze field measurements of bridge scour is being conducted by the U.S. Geological Survey in cooperation with the Federal Highway Administration. The primary objective...

The Design of Scour-Safe Bridges
Two new highway systems, the East Papago and the Pima freeways, are currently under design and construction within the Phoenix, Arizona, metropolitan area. Both of these highways will...

Scour Measuring and Monitoring Equipment for Bridges
The National Cooperative Highway Research program (NCHRP), through the Transportation Research Board (TRB) of the National Academy of Sciences, is currently sponsoring a research effort...

Bridge Scour and Stream Instability Countermeasures
Stream instability is characterized by lateral or vertical instability. Such instability has led to the failure of bridges and loss of life. Lateral instability is caused by lateral migration...

Bridge Scour Research Needs
This paper presents a summary of the Federal Highway Administration (FHWA) priority research emphasis on bridge scour, sedimentation, and stream stability problems. The most persistent...

Hydraulic Roughness and Sediment Yield in Wheel Ruts on Forest Roads
Clear water flow and sediment yield from simulated wheel ruts in a forest road were measured at five different sites in the Northern Rocky Mountains. These measurements provided information...

Model Studies on Local Scour
In this investigation, the scaling procedure of a scour model in the laboratory has been indicated. The results have been compared with the prototype data....

Liabilities in Temporary Structures Failures?Representative Case Histories
Eight case studies involving construction accidents caused by failure of temporary structures are presented. These studies illustrate the oftentimes unintended consequence of utilizing...

FHWA'S Bridge Temporary Works Research Program
The Federal Highway Administration (FHWA) has developed a research program to address bridge falsework design and construction. This resulted from the collapse of the Route 198 bridge...

Performance of a Prestressed Rigid Frame During Removal of Column 6W from I93 in Boston, Massachusetts
The first phase of the suppression of Boston's Central Artery included the Early Viaduct Construction in the Central Artery North Area. This project required that Column 6W...

Permanent Structure as Part of the Underpinning System for Boston's Central Artery
The Central Artery, a major six lane structural steel viaduct, has been one of Boston's most significant roadways over the past three decades. Increasing congestion, accidents,...

Design and Planning of Structural Steel Roll-In
Innovative construction methods were required to erect structural steel inside a 170 foot long box truss over a railroad. The contractor engineered and executed a unique system to roll...

 

 

 

 