Philosophy for Treatment of High-Pressure Natural Gas Pipelines at Active Fault Crossings
Natural gas from fields in the overthrust belt of southwest Wyoming will be collected and transported to Southern California. The proposed Kern River Pipeline will transport gas to Daggett,...

Simplified Tidal-Flushing Model for Small Marinas
This paper describes the development and application of a new water quality screening model - STEAM (Simplified Tidal Embayment Assessment Model). This model simulates the first-order...

Marinas and Waterfront Redevelopment, Brisbane
This paper describes a selection of marina projects which are being developed at locations of abandoned commercial wharves in the Brisbane River, and the impact of this transformation...

Riverbank Renewal
In Providence, project teams from the public and private sector worked side-by-side, rerouting two rivers and constructing a new corporate headquarters. What made the task more challenging...

Air-Water Mass Transfer
This monograph, Air-Water Mass Transfer: Selected Papers from the Second International Symposium on Gas Transfer at Water Surfaces, consists of papers presented at the Symposium which...

Calendar: Bridges 1992
Featured bridges are: Fifficktown Bridge (PA); Crooked River (High) Bridge (OR); High Bridge (KY); Fort Benton Bridge (MT); Linden Street Bridge (MA); Rogue River (Caveman) Bridge (OR);...

High Wiring Act
Prendergast describes a project to construct a 345 kV transmission line over 313 mi in southwestern New Mexico, in which, due to environmental considerations and limited access, extensive...

Anchorage Sewer Rehabilitation in Campbell Lake
This paper discusses the proposed rehabilitation/replacement of the Campbell Lake portion of the Campbell Creek C-5 Trunk Sewer (C-5 Trunk) located in Anchorage, Alaska. The original corrugated...

Twin Pipeline Crossing of the Fraser River
A new creek water supply was developed for the communities of Mission and Matsqui, British Columbia, Canada, in the early eighties. Over 60 kilometres of 450 mm to 900 mm diameter ductile...

High Level Radioactive Waste Management at the Savannah River Site
This paper describes the High Level Radioactive Waste (HLW) generated at the Savannah River Site (SRS), outlines how it has been managed over the 35 years since site operations began,...

Reliability Estimation for Vertical Lift Gate at Emsworth Dam
The lift gates are composed of two horizontal trusses, two vertical girders, seven diaphragms, and two end frames. A critical element in the structural integrity of the lift gate is a...

Economic Assessment of Infrastructural Development for the Gurara River in Nigeria
Based on the preliminary designs of the hydraulic structures for the proposed Gurara river water development project in Nigeria, an economic feasibility analysis is presented. The cost...

Retrofitting a Regional Stormwater Facility
The City of Tacoma, Washington, constructed a regional stormwater detention facility in the Leach Creek watershed in 1961 to permit development in the southwest corner of the City while...

Rehabilitation of Rapidly Urbanizing Streams
DuPage County, Illinois is implementing a stream maintenance program with the purpose of restoring and preserving the hydraulic efficiency of its streams and drainageways. The program...

Water Utility Demand Forecasting Using Lotus 1-2-3 Spreadsheet
In this study, a technique has been developed using Lotus 1-2-3 spreadsheet for distributing projected populations to small sectors throughout the study area. This procedure divides the...

The Multi-Watfore Method: A Water Demand Forecasting System
The multi-Watfore method, which combines the cascade model and a first order analysis of uncertainty, is a system of practical steps to develop models of water demand while generating...

Preliminary Report of the Feasibility of an Interbasin Water Transfer Through Existing Canal Systems
A preliminary feasibility study of the interbasin transport of water from the Sabine River on the Texas Louisiana border to the San Jacinto River Basin, northeast of Houston, Texas, using...

Sediment Management Challenges of the Red River Waterway Project
The Red River Waterway project consists of channel stabilization and construction of navigation locks and dams to provide a 9 foot minimum depth for a distance of approximately 236 miles,...

Managing Two Lakes with Significant Tailwater Fisheries
Norfork and Bull Shoals Dams on the White River in Arkansas were constructed in 1944 and 1951, respectively. The authorized purposes were for flood control, hydropower generation, and...

Administration of the Pecos River Compact Between New Mexico and Texas
The Pecos River Compact specifies the allocation of water between New Mexico and Texas. Due to difficulty in reaching agreement Texas sued New Mexico in the Supreme Court. The Court issued...

 

 

 

 

Return to search