For 87 years Oklahoma's state capitol remained unfinished, the majestic cast-in-place concrete dome its designers envisioned never built. But as Oklahoma approached its centennial�to...
Monitored Natural Recovery and Dredging Decision Analysis at Bellingham Bay, Washington
The Whatcom Waterway Site, located within inner Bellingham Bay, Washington consists of intertidal and subtidal aquatic lands within and adjacent to the Whatcom Waterway in Bellingham,...
Sediment Remediation at the Unnamed Tributary to the Ottawa River
A sediment removal action was conducted in the Unnamed Tributary to the Ottawa River to address sediments containing polychlorinated biphenyls(PCBs) at concentrations up to 74,000 mg/kg....
Application of the NRC Framework for Evaluation of Remedial Actions at a PCB Contaminated Sediment Site
The National Research Council recently proposed that the framework of the Presidents/Congressional Commission on Risk Assessment and Risk Management be applied to the selection and implementation...
A Realistic Vision for the Future of IT in Civil Engineering and a Plan for Achieving It
In October 2001, a group of experts from the capital projects industry met in San Antonio, Texas to begin development of a comprehensive technology research and development (R&D)...
Model Water Sharing Agreements for the Twenty-First Century
Sponsored by the Task Committee for the Shared Use of Transboundary Water Resources of the Environmental and Water Resources Institute and the Laws and Institutions Committee of ASCE....
The Nisqually, Washington, Earthquake of February 28, 2001
Lifeline Performance
Prepared by the Technical Council on Lifeline Earthquake Engineering of ASCE. This TCLEE Monograph details the effects of the Nisqually, Washington,...
Dissecting the Collapses
The September 11 terrorist attacks on the World Trade Center horrified the civilized world. An estimated 2,830 human lives were extinguished by these attacks. In the aftermath of the events,...
Physical Model of Current-Induced Scour at Ventura Harbor
This paper describes a 1:25-scale movable-bed physical model study of scour resulting from longshore current passing through a narrow gap on the leeside of the detached breakwater at Ventura...
Comparison of Hydrodynamic Parameters for a Floating Breakwater
The U. S. Army Engineer Research and Development Center is in the process of developing a Rapidly Installed Breakwater System (RIBS) for use in Joint Logistics Over the Shore Operations...
Montioring and Modeling of Tandem Breakwater System at Hammond, IN
A tandem breakwater system was constructed in 1989-90 to provide protection for a large marina at Hammond, IN, at the south end of Lake Michigan. A five year monitoring program (1993-98),...
Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...
Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...
St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...
Application of Multibeam Echo Sounding and Side Scan Sonar for Mapping of Shoreline Protection Revetments
The use of multibeam survey methodology coupled with high precision positioning systems for the mapping of shoreline protection features and the adjacent offshore areas allows development...
Big Idea
The reconstruction of the Big I�the intersection of interstate routes 25 and 40 in Albuquerque that was named for its appearance from the sky�was likely to disrupt commuters and interstate...
Effect of Aluminum Compression on ACSR Conductor Sags at High Operating Temperatures
Deregulation and restructuring are sweeping the electric utility industry in the United States. As a result, many utility engineers are analyzing, re-rating, and upgrading their most critical...
Geotechnical Aspects of Beach Restoration
Large-scale beach restoration undertaken by the U.S. Army Corps of Engineers in Florida requires millions of cubic yards of beach quality sand. Exploration for these sand resources starts...
Rhythm of Beachrock Levels in Contrasting Plate Settings: Rifting Red Sea and North American-Caribbean Plates
Sequences of beachrocks have been compared from the northern Red Sea, the North American plate (north shore of Puerto Rico), and an island of the Caribbean plate. In all these areas the...
Characteristics and Implications of Relict Carbonate Paleoshorelines
Throughout the Florida-Bahamas region, the accumulation of coastal carbonate deposits, excepting the present highstand, appears to be episodic. Back through time these deposits provide...