Hydrologic Criteria: NPS Water Quality Assessment
This paper summarizes the authors deliberations and findings regarding selection of hydrologic conditions suitable for the evaluation of the water quality impacts of nonpoint sources (NPSs)...

Who is the Public?
The old concept of applying to the state for a right to use water has changed as the availability of unappropriated water has disappeared. Today the emphasis is on acquiring a water right...

Far-Field Numerical Model Studies for Boston's New Secondary Treatment Plant Outfall Siting
By the late 1900s, Boston is scheduled to have built a new secondary treatment plant that combines the waste streams from two existing plant, and discharges the resulting liquid effluent...

Hydraulic Design Aspects of the Boston Outfall
The diffuser outfall under design for Boston must have the ability to be purged of seawater upon commissioning or following an accidental flow stoppage. The criteria governing the flushing...

Siting the New Boston Outfall: Near-Field Considerations
This paper describes a procedure applied in near-field considerations for siting the new outfall to serve the Massachusetts Water Resources Authority's (MWRA) proposed regional...

Retrospective Look Into Design Challenges of Boston Interceptors
The purpose of this paper is to share with designers and owners a retrospective evaluation of a major sewer system design effort. The process by which a major sewer design project reaches...

Boston's Water Distribution Corrosion Control Program
The Boston Water and Sewer Commission (Commission) was formed in 1977 with a mandate to maintain sound, economical, and efficient systems for water distribution and wastewater collection...

Planning for Rehabilitation?MWRA Waterworks System
The Massachusetts Water Resources Authority (MWRA) operates and maintains 255 miles of large diameter distribution mains. Existing problems include increasing steel pipe repairs and extensive...

Survey of Groundwater Contamination in Massachusetts
Public water supplies in Massachusetts have been contaminated or threatened from a number of sources. The purpose of this paper is to outline the nature of groundwater contamination and...

Inter-Agency Cooperation for Coastal Protection
The complexity of the problems pertaining to the degradation of coastal waters is such that no single agency can adequately regulate and manage all activities that affect the water quality...

Boston Harbor and Massachusetts Bay?Issues, Resources, and Management
The major pollutant discharges into Boston Harbor and Massachusetts Bay can be categorized as follows: municipal discharges, sewage sludge, combined sewage overflows (CSOs), individual...

Nantucket's Broad Creek Opening
On September 20-21, 1961 a severe coastal storm, the remnant of hurricane Esther, formed a 1,200 foot wide, 20 foot deep opening in a barrier beach (Smith's Point at Broad...

The Massachusetts CZM Project Review Process
In 1978 the Massachusetts Coastal Zone Management Program (MCZMP) became the first CZM program on the East Coast to be approved by the U. S. Department of Commerce and is now in its ninth...

Massachusetts Marine Lakes Restoration Program (abstract)
The Massachusetts Department of Environmental Quality Engineering, Division of Water Pollution Control, administers the state's Clean Lakes and Great Ponds Program. The program,...

Mathematical Simulation of Halocarbon Distributions in Boston Harbor
In an effort to better understand the sources and transport of effluents, a combined modeling and field measurement program has been initiated. The modeling uses a pair of 2-D (depth-averaged)...

Estimating Low-Flow Frequencies of Ungaged Streams in New England
Equations to estimate low flows were developed using multiple-regression analysis with a sample of 48 river basins, which were selected from the U. S. Geological Survey's...

Automated Pavement Management Systems for Agencies
This paper presents and assesses a microcomputer software package which has been designed for use in six cities and towns in Massachusetts. The package employs a readily available database...

Improving the Financial Basis of Transit Planning
Three examples of new transit capital management procedures are described: a Plant and Facilities Development Program and Bridge Management System for Boston's Massachusetts...

The Lowell Hydroelectric Project: A Case Study
The Lowell Hydroelectric Project, located on the Merrimack River in Lowell, Massachusetts, consists of an existing dam, canals, and turbine generating equipment presently operating at...

Perforated Wave Barriers in Small Boat Piers
Perforated breakwaters can be used to reduce the energy and the height of waves entering small boat harbors. By not extending the breakwater to the bottom interference with littoral drift...

 

 

 

 