Characterizing the Pathways and Characteristics of Nutrients Discharging from Ground-Water to Surface Water
Any investigation of surface-water quality for a lake or pond requires accurate estimates of the contributing contaminant or nutrient loads. In many cases, inflow from the adjacent ground...
Neponset Fish Passage and Habitat Restoration Project
This project was initiated to examine the feasibility of restoring fish passage, aquatic habitat and riparian habitat on the downstream reach of the Neponset River in Milton and Boston,...
Design Live Loads for Parking Garages
The objective of this research project is to obtain a better understanding of parking garage live loads and to recommend an appropriate value for design. A load survey was conducted in...
Impacts of Global Climate Change upon a Regional Aquifer System in the Northeastern United States
(No paper) The Charles River Basin is a major water resource in eastern Massachusetts. It used for a variety of purposes including water supply, industrial cooling, waste disposal, flood...
Special Geotechnical Testing: Central Artery/Tunnel Project in Boston, Massachusetts
The Central Artery/Tunnel Project (CA/T) in Boston, Massachusetts, is the largest urban highway construction project in the history of the interstate system. The magnitude and complexity...
Design and Construction of Earth Retaining Systems
This proceedings,
Below Boston's New Bridge
The Charles River Bridge, a 10-lane cable-stayed structure will be the widest cable-stayed bridge in the world. The bridge is 1,460 ft long with a main span between towers of 745 ft. This...
Watching Under Boston
Managing the daily operations of Boston's Central Artery/Ted Williams Tunnel project requires integrating a variety of hi-tech systems to ensure efficient traffic flow. The...
A Signature Bridge for Boston (Available only in Structural Engineering Special Issue)
The first hybrid steel and concrete span in America will debut over the Charles River in Boston, carrying ten lanes of interstate traffic and serving as an elegant capstone to the largest...
Boston's Central Artery/Tunnel Project: Challenging Problems, Innovative Solutions
Boston's Central Artery/Tunnel (CA/T) Project is the largest, most complex highway project ever undertaken in the United States. Conceived a quarter centrury ago, the project...
Rerouting Boston's Utilities
During construction of the Central Artery/Tunnel project in downtown Boston, engineers had to move utility lines over and under both new and existing infrastructure and maintain utility...
Boston's Third Harbor Tunnel (Available only in
Boston's immersed marine tube, the Third Harbor Tunnel, connecting South Boston and Logan Airport, is a $226 million component of the multi-billion dollar Central Artery/Third...
Central Artery/Tunnel (CA/T) Project Environmental Permitting
The Central Artery/Tunnel Project is one of the largest public infrastructure projects in the United States. As such it poses major environmental planning and design challenges. The environmental...
Combined Flood Hazard Mitigation Techniques for Comprehensive Planning? The Saugus River Coastal Flood Risk Reduction Plan
The development of an alternative Coastal Flood Risic Reduction Plan for the Saugus River was initiated by the Executive Office of Environinental Affairs (EOEA) of Massachusetts in April...
Water Quality Impacts of Dredging and Disposal Operations in Boston Harbor
The Massachusetts Port Authority is presently planning a navigation improvement project in the port of Boston, consisting of dredging the 10.7 m (35 ft) deep channels and berths in the...
Boston's Home Run
The $1.3 billion Ted Williams Tunnel, the first part of Boston's Central Artery/Third Harbor Tunnel Project to be completed, has been designated the Outstanding Civil Engineering...
An Interception by Boston
Engineers in Boston were recently challenged to design a rehabilitation and replacement for sections of the 60-year-old St. James Avenue sewer system. Approximately 20,000 vehicles per...
Boston Blockbuster
The Central Artery/Tunnel project in Boston is probably the single largest publicly-funded transportation project in the country at present. The total cost will be between $8 and $10 billion...
Boston's Commuter Comeback
More than 30 years after its abandonment, the Old Colony Railroad in Massachusetts is being revived through a �480 million rehabilitation project to serve residents southeast of Boston....
Case Study - Performance of Diaphragm Walls During Construction; Predictions vs. Field Measurements
Rigid diaphragm walls (slurry walls) are being used more than any other earth supporting system for underground construction projects in confined downtown sites throughout the United States...