Socioeconomic Characteristics and Transportation in Berlin
Berlin's future as a site of commerce and services, as a significant goods handling center and as an important focus for commercial relationships, is dependent upon an intact transportation...

The Berlin Local Transport Company (BVG): A Part of Berlin
Public transport was in existence in Berlin for more than 150 years. Buses, trams, and underground trains were combined in a single company, whose initials BVG became part of Berlin. As...

Case Studies in Optimal Design and Maintenance Planning of Civil Infrastructure Systems
Sponsored by the Structural Engineering Institute of ASCE. This collection contains 19 papers on the optimal design and maintenance planning of civil...

Fuzzy Rule-Based Forecasting of Extreme Rainfall Probability Conditioned on Sea Surface Temperature
(No paper) The recent El Nino event demonstrated the importance of sea-surface temperature on rainfall anomalies. The purpose of this paper is to develop a methodology to forecast extreme...

Design and Construction of Earth Retaining Systems
This proceedings, Design and Construction of Earth Retaining Systems, contains papers presented at sessions sponsored by the Geo-Institute...

Final Covers for Solid Waste Landfills and Abandoned Dumps
This book presents the essential elements for the design of final covers for solid waste landfills and abandoned dumps. Chapter 1 gives an overview and presents selected aspects of regulations...

The Last Two Extreme Floods in Germany?Analyses and Consequences
The last two extreme floods in Germany occurred in December 1993/January 1994 and January 1995 within the River Rhine basin with both floods having different causes. In a comparison study,...

Impact of Anthropogenic Activities in Rivers Upon Accuracy of Hydrological Forecasts and on Development of Forecasting Methodologies?Experiences from the Slovak-Hungarian Reach of Danube
The Danube, as an international river, crosses eight states of Europe. This calls for the need of close cooperation of the Danubian countries, particularly for operational forecasts issuance,...

Advances in Underground Pipeline Engineering II
The first international conference on Advances in Underground Pipeline Engineering was held in 1985. Some 50 authors and over 300 delegates from 20 countries took part in the presentations...

Berlin's Big Dig
As the first of many major development projects for the new Berlin, the DM 1.5 billion FriedrichstadtPassengen project is the largest private construction investment in Berlin's...

Messeturm Tower: Frankfurt, Germany
A 256 meter (840 feet)tall office tower, currently the tallest building in Europe, has been constructed in Frankfurt Germany. The 7- story structure with 85500 square meter (920,000 square...

Morphology of Reciprocal Frame Three-Dimensional Grillage Structures
This paper is an introduction to the morphology of structures using the Reciprocal Frame (also known as Mandala Dach in Germany) which is a patented three-dimensional beam grillage structural...

Three Dimensional Modelling of Estuarine Sediment Transport
This paper describes the sediment transport module in the three-dimensional finite element model TELEMAC-3D which uses the operator splitting technique to solve the shallow water and transport...

Comparison of Current Meters Used for Stream Gaging
The U.S. Geological Survey (USGS) is field and laboratory testing the performance of several current meters used throughout the world for stream gaging. Meters tested include horizontal-axis...

A Watershed Model for Estimating Suspended Sediment Hydrographs
A mathematical model was developed to estimate soil detachment and transport and, consequently, suspended sediment hydrograph for single storms on a watershed basis. In this linear cascade...

Constructed Civil Infrastructure Systems R&D
A European Perspective
This report, Constructed Civil Infrastructure Systems R&D: A European Perspective, presents findings from the Civil Engineering Research...

Single-Shell Shotcrete Method
On a 60-m-long test stretch in the course of the construction of the Munich Subway the single-shell jointless shotcrete method was employed. In this case the standard cross section of...

Object-Oriented Data Exchange for the Integration of Design Processes in Structural Engineering
The computer integration of tasks, activities, tools, user and data exchange interfaces, management of knowledge etc. requires a new approach by object-oriented modeling in civil engineering....

Assumptions Behind Ridership Forecasts for High Speed Ground Transportation Systems and Their Validity: The California-Nevada Case Study
Accurate prediction of ridership is one of the key elements for approval of any transit project and eventually for survival after the system begins operation. This is particularly true...

Technology Transfer Considerations Associated with Maglev Programs
Magnetic levitation (maglev) high-speed ground transportation technology, near operational status in Germany and well along in development in Japan, is now a candidate for transfer to...

 

 

 

 

Return to search