Site Conditions

by
Standard Design and Construction Guidelines for Microtunneling Committee


Part of: Standard Design and Construction Guidelines for Microtunneling

Abstract:

The owner and the engineer should visit the proposed site during the initial planning phase and periodically throughout design to identify site conditions and constraints. A survey of existing site conditions, both surface and subsurface, should be performed in the early stages of planning.



Subject Headings: Subsurface environment | Site surveys | Owners

 

Return to search