Site Conditions
byStandard Design and Construction Guidelines for Microtunneling Committee
Part of: Standard Design and Construction Guidelines for Microtunneling
Abstract:
The owner and the engineer should visit the proposed site during the initial planning phase and periodically throughout design to identify site conditions and constraints. A survey of existing site conditions, both surface and subsurface, should be performed in the early stages of planning.
Subject Headings: Subsurface environment | Site surveys | Owners
Return to search