Returning Veteran
The Veteran's Memorial Bridge on the Cuyahoga River is a vital link in the transportation system of Cleveland and a gateway to the city's downtown area. But time...

Analysis of Bank Stabilization in Steep Complex Streams Using A Two-Dimensional Model
In cases where the channel is fairly uniform, and not divided, one-dimensional hydraulic models, such as HEC-2, generally give adequate results for scour evaluations and bank protection...

Training for Bridge Inspectors in Stream Stability and Scour
The Federal Highway Administration (FHWA) is now requiring a comprehensive evaluation of bridge scour as part of the National Bridge Inspection Standards (NBIS). FHWA has established January...

Habitat Preservation and Enhancement Associated with San Diego Creek Flood Control Channel Improvement
San Diego Creek, an important regional flood control channel in southern Orange County, California, flows 2.4 kilometers through the mixed-use areas of Irvine Center (San Diego Freeway...

Rock Riprap for Grade Control
Rock chutes (riprap channels on steep slopes) are used as grade control structures to safely conduct a water flow to a lower elevation. Common procedures used for design of rock riprap...

Application of Regime Theory in Practice: A Case Study
Alluvial channels are known to adjust their slope, width, depth and velocity to achieve stable conditions given a supply of water and sediment. Scientific investigations of stable channels...

California Border Environment Activities Since Passage of NAFTA
This paper presents a summary of the activities undertaken by the State of California to improve the border environment since passage of the North American Free Trade Agreement (NAFTA)...

Reduction of Downstream Impacts Through Use of Variable Detention Basin Volume Requirements
The Pre-post Match is the standard policy for regulating the design of detention basins for new developments despite evidence showing that as multiple developments occur in a watershed,...

Santa Ana River Mainstem Project
The Santa Ana River Mainstem Project consists of seven major features including the construction of 550 ft. high earth and rockf ill dam; raising the embankment by 28 feet of Prado Dam,...

Design Alternatives for Protection of the Santa Ana River Interceptor Sewer
The Santa Ana River Interceptor Sewer (SARIS) line buried within the floodplain of the Santa Aria River is being threatened by long term degradation of the river bed at the pipeline crossings,...

European Progress on river Renaturalisation
Most restoration projects in Europe have been designed to maximise species richness with little regard for channel stability. To recreate a sustainable natural channel it is necessary...

Role of Vegetation in Hydraulics of Channel Restoration
Boundary layer theory is used to develop a backwater model for flows through vegetated waterways which can be employed to approximately estimate flow depth variation in channel restoration...

Maryland SHA's Procedure for Assessing Existing Bridges for Scour Vulnerability and for Rating Unknown Foundations
The Maryland State Highway Administration developed a recommended screening procedure for rating existing bridges for Item 113, Scour Critical Bridges, in the National Bridge Inventory...

Economic Risk Analysis as a Research Directing Paradigm
Risk analysis could be used to direct a manageable, prioritized strategic plan for evaluating bridge scour research needs. Through risk analysis, the costs of research and the potential...

Utilizing Geomorphic Analogs for Design of Natural Stream Channels
Engineering guidelines for the design of stable rock armored channels are well established. However, few guidelines exist for designers involved with the reconstruction of channels with...

Reduction of Sediment Loads in DEC Streams
The U.S. Army Corps of Engineers, Demonstration Erosion Control (DEC) project is actively involved in the stabilization and restoration of many drastically disturbed incising streams in...

Scour-Hole Dimensions at Selected Bridge Piers in New York
Knowledge of scour-hole dimensions can be used by bridge engineers to deter mine the extent of countermeasures needed to prevent scour at bridge piers. Scour-hole widths at 128 piers,...

Design Guidance?Instream and Bank Restoration Structures
Despite an urgent need for river and stream restoration design criteria, little guidance has emerged in recent years. Existing guidance is largely unsatisfactory, promoting empiricism...

Design Guidelines for Bioengineered Bank Stabilization
Design of bioengineered slope stabilization measures in riverine environments to minimize rates of stream bank erosion requires accounting for hydrologic, hydraulic, geomorphic, geotechnical,...

River Restoration Considerations Beyond Channel Design
Restoration of river systems in highly disturbed environments poses unique challenges beyond channel design. The Jordan Creek Restoration project in Idaho was conducted in a valley disturbed...

 

 

 

 

Return to search