Banking on a Bridge
Completing the geotechnical design for the approach embankments and foundations for the Charter Oak Bridge, which crosses the Connecticut River between Hartford and East Hartford, Conn.,...

Ductility Analysis of Overload and Settlement
The concept of sufficient ductility to avoid premature or brittle failures is gaining wide acceptance in structural engineering and is an important aspect in mitigating the consequences...

Mud Mountain Dam Concrete Cutoff Wall
Mud Mountain Dam is an earth and rockfill flood control dam on the White River. The dam is located approximately 50 km southeast of Seattle, Washington. The dam was constructed in 1941...

Improving Seismic Safety of Dams in California
A search of the dam files at California's Division of Safety of Dams has revealed that at least 94 dams have been improved for seismic stability. The results of the search are tabulated...

A Review of Drilling and Grouting Methods for Existing Embankment Dams
With the increasing emphasis being placed on dam rehabilitation and repair, more dam engineers are faced with the need to interface with drilling and grouting specialists. Regretfully,...

Soil Nailing Technique in Tunnel Support
Authors have developed a new pre-lining method (PASS method) in which thin archshell lining is formed ahead of the tunnel face before the excavation to reinforce the ground. This method...

Consolidation Settlement Potential in South Louisiana
Primary consolidation is an important cause of wetland loss in active and recently abandoned deltaic plains in south Louisiana. Argillaceous and organic facies are most subject to reduction...

Use of Pressuremeter in Mixed Highrise Foundation Design
The pressuremeter has been used extensively for the evaluation of strength and deformation characteristics of the glacial hardpan soils in the design and construction of caisson foundations...

Negative Skin Friction Due to Wetting of Unsaturated Soil
A steel building at a cement plant un Utah was originally supported by spread footings. Shallow wetting of the coarse granular soils supporting the footings resulted in over three inches...

A Laboratory Procedure for Partial-Wetting Collapse Determination
Partial wetting results in partial collapse, which is linked to the reduction in soil suction caused by wetting. The laboratory procedure presented in this paper represents a modification...

Two-Time Winner
After more than a century of service as a major U.S.-Canada rail link, the existing St. Clair River Tunnel between Port Huron, Mich. and Sarnia, Ontario is being replaced by a new tunnel...

Dynamic Compaction of Nuclear Waste
When ponding, caused by settlement of the original soil cover over low-level nuclear waste buried at the Department of Energy's Savannah River Nuclear Plant near Aiken, S.C.,...

Better Cover-Ups
Designing the final cover for a solid waste landfill or remediation site is often trickier than designing its lining because a cover will undergo more unpredictable stress and distress...

Differential Motions in Sedimentary Valleys
The differential motions (strains), induced in sediment-filled valleys due to incident seismic waves, are investigated. The response of a two-dimensional model of an asymmetric wedge-shaped...

Measured Fill Performance at Berths 212-215 in the Port of Los Angeles
This paper summarizes the performance of an instrumentation fill constructed in open water in the Port of Los Angeles (Port). A new container-handling facility was constructed that consisted...

Minipile Milestone in Memphis
The maintenance/administration facility for Memphis, Tennessee's 300-bus fleet began displaying structural problems before it even opened for service in 1979. The 23 acre...

Skin Friction Distrtibutions on Piles in Sand
Presented in this paper are early results from an analytical investigation of the performance of a closed-ended pipe pile under monotonic axial loading in dense sand. The study was performed...

Settling Down Easy
In order to more fully participate in the international and Asian Pacific aviation network, it was decided to establish a highly efficient 24-hour a day operation at the New Kansai International...

Single Pile and Pile Group in Permafrost
The results of laboratory and field experiments on single pile and pile group behaviour in frozen soils are reported. It was shown that the character of soil deformation was influenced...

PS 5 Sewage Lagoon Embankment Stabilization
In 1981 an embankment containing a three-cell wastewater treatment lagoon was constructed adjacent to the northern edge of the Pump Station 5 gravel pad on the Trans Alaska Pipeline System....

 

 

 

 

Return to search