Soil Nailing Technique in Tunnel Support

See related content

by Y. Taguchi, Fujita Corp, Tokyo, Japan,
M. Hada, Fujita Corp, Tokyo, Japan,
K. Kagawa, Fujita Corp, Tokyo, Japan,
T. Hara, Fujita Corp, Tokyo, Japan,

Document Type: Proceeding Paper

Part of: Shotcrete for Underground Support VI:

Abstract: Authors have developed a new pre-lining method (PASS method) in which thin archshell lining is formed ahead of the tunnel face before the excavation to reinforce the ground. This method was applied to Katsutadai railway tunnel of 10 m in diameter. The excavation was done through a diluvial sand with 7 m overburden. As a result, the execution speed was improved and the total surface settlement and the shotcrete stress was relatively small.

Subject Headings: Tunnels | Soil nailing | Excavation | Soil settlement | Soil stress | Rail transportation | Linings | Sandy soils | Japan | Asia