Field Fabrication of Reinforced Plastic Pipes
A new technology allows fabrication of reinforced plastic pipe in the field, or the lining of existing pipe. The plastic used can be selected to meet job and site requirements. The reinforcing...

Aseismic Calculations for Transmission Towers
In this paper, mechanical models for long-span transmission line systems under elastic and gravitational restoring forces are established in three different directions; this continues...

Seismic Hazards Associated with a Major San Diego Lifeline Corridor
Evidence for multiple Holocene earthquakes on the Rose Canyon fault zone in San Diego sheds new light on the seismic hazards of San Diego, and in particular, a major lifeline corridor....

Frictional Base Isolation Using a Layered Soil-Synthetic Liner System
The application of smooth geotextile liner materials to seismic base isolation of shallow foundations has been evaluated using laboratory testing and numerical analysis. Laboratory testing...

Guidelines for Electrical Transmission Line Structural Loading
This manual presents detailed guidelines and procedures for developing transmission line structure loads. It is divided into four sections. The first section is concerned with the load/strength...

Landfill Liners from Top to Bottom
Since EPA began requiring geomembrane liners in 1982, liner system components have multiplied rapidly. At the same time, there has been a movement toward relatively large, sophisticated,...

Reliability of Overhead Transmission Lines Subjected to Wind Action
The probability distribution of the strength of steel towers used in transmission lines, due to wind excitation, is evaluated on the basis of test results of 72 towers of various designs,...

Reliability of Electric Power Transmission Systems in Seismically Active Metropolitan Tokyo: Part 1. Network Modeling
A method is proposed for modeling electric power transmission systems. The model can be used to evaluate the reliability of the network connectivity in a seismically active region. It...

Reliability of Electric Power Transmission Systems in Seismically Active Metropolitan Tokyo: Part 3. Seismic Reliability Analysis
The seismic reliability of the connectivity of electric power transmission networks is evaluated by using the results of Parts 1 and 2. The fragility curves for the supporting structures...

Lining Up Against Oil
Officials of California's Metropolitan Water District were more than slightly concerned when seeping oil showed up in the Newhall Tunnel, the last leg of a project that brings...

Relining of Jordan Aqueduct, Reach 3
As pipelines approach their life expectancy, they may need to be replaced. Or in some instances, replacement is needed much sooner due to defective pipe. Normal replacement operations...

A Rational Basis for Determining Safety of Containment
Design of waste containment facilities may follow one of three tacts: (1) the liner and cover systems may have prescribed components of predetermined minimum thicknesses and hydraulic...

Conductivity and Transit Time Estimates of a Soil Liner
A field-scale soil linear was built to assess the feasibilty of constructing a liner to meet the saturated hydraulic conductivity requirement of the U.S. EPA (i.e., less than 1 ? 10-7...

Development of an Underwater Canal Lining Method
The U.S. Bureau of Reclamation is developing a method of lining a large irrigation canal in-place while water flows in the canal, using an impermeable plastic membrane covered with concrete....

A Modern Approach to the Design of Grassed Channels
The design of grassed channels can be based on modern fluid mechanics principles. The resistance to flow in a grassed channel is linked directly to the relative roughness of the flow through...

An Evaluation of the Large Mammal Entry/Escape Steps Coachella Canal In-Place Lining Project
This study evaluated the effectiveness of a new system of large mammal entry/escape steps as part of the environmental investigations for the Coachella Canal In-place Lining Prototype,...

Landfill Liner Quality
Landfill liners are being made with new synthetic materials, materials which may be beyond the knowledge of the engineer in charge of the landfill construction project. Engineers need...

Long-Term Performance Reliability of Wood Materials
The United States faces a major task in maintaining and rebuilding the nation's infrastructure in the 1990's and beyond. Economic constraints have limited funds...

Construction Quality Assurance for Geomembranes
The results of and lessons learned from construction quality assurance (CQA) programs on 19 geomembrane liners are presented. The specifications are generally exceeded by comfortable margins...

Grouting Slip Liners: The New Inside Story
There are approximately 800,000 miles of water and sewer pipelines in the U.S. that need remedial work. About 2% need work each year, usually due to normal or accidental corrosion. Normal...

 

 

 

 

Return to search